Proactive Production Scheduling Approach for Off-Site Construction with Due Date Uncertainty

This study proposes a robust precast concrete (PC) production scheduling model for PC construction projects with schedule uncertainty by adopting a proactive scheduling approach. The proposed model consists of a PC production simulation module that simulates and evaluates the total tardiness of the...

Full description

Saved in:
Bibliographic Details
Main Authors: Taehoon Kim, Yong-Woo Kim
Format: Article
Language:English
Published: MDPI AG 2024-11-01
Series:Applied Sciences
Subjects:
Online Access:https://www.mdpi.com/2076-3417/14/23/11017
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:This study proposes a robust precast concrete (PC) production scheduling model for PC construction projects with schedule uncertainty by adopting a proactive scheduling approach. The proposed model consists of a PC production simulation module that simulates and evaluates the total tardiness of the schedule at a certain confidence level with contractor schedule uncertainty and a GA-based production schedule optimization module that finds an optimal schedule through iterative schedule generation and evaluation using a PC production simulation module. The experimental study shows that the proposed model can find the best schedule with 303.8 h of tardiness at a 100% confidence level, followed by NEHedd 324.7 h, basic GA 328.5 h, and EDD 335.8 h. The results of this study will help PC production schedulers to perform robustly despite contractors’ schedule changes and will thus contribute to the successful completion of PC construction projects.
ISSN:2076-3417