A Multi-Stage Approach for External Trucks and Yard Cranes Scheduling with CO<sub>2</sub> Emissions Considerations in Container Terminals
<i>Background</i>: In container terminals, optimizing the scheduling of external trucks and yard cranes is crucial as it directly impacts the truck turnaround time, which is one of the most critical performance measures. Furthermore, proper scheduling of external trucks contributes to re...
Saved in:
| Main Authors: | Ahmed Talaat, Mohamed Gheith, Amr Eltawil |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
MDPI AG
2023-11-01
|
| Series: | Logistics |
| Subjects: | |
| Online Access: | https://www.mdpi.com/2305-6290/7/4/87 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Integrated Scheduling of Automated Yard Cranes and Automated Guided Vehicles with Limited Buffer Capacity of Dual-Trolley Quay Cranes in Automated Container Terminals
by: Doaa Naeem, et al.
Published: (2022-12-01) -
Scheduling External Trucks Appointments in Container Terminals to Minimize Cost and Truck Turnaround Times
by: Ahmed M. Abdelmagid, et al.
Published: (2022-07-01) -
An Improved Whale Optimization Algorithm for the Integrated Scheduling of Automated Guided Vehicles and Yard Cranes
by: Shuaishuai Gong, et al.
Published: (2025-01-01) -
Joint Allocation of Shared Yard Space and Internal Trucks in Sea–Rail Intermodal Container Terminals
by: Xiaohan Wang, et al.
Published: (2025-05-01) -
Integrated Scheduling of Handling Equipment in Automated Container Terminal Considering Quay Crane Faults
by: Taoying Li, et al.
Published: (2024-10-01)