Technical and economic analysis of full and empty crossing methods in the sequence of station and tunnel construction in Tehran metro line seven
Due to the expansion of urban spaces and as well as the lack of necessary spaces for intra-city transportation, the need for subway construction in urban areas is more acute than ever. In order to build a subway,it is necessary to build underground structures such as tunnels and several stations.Tod...
Saved in:
| Main Authors: | Seyed Amirhossein Ghoreishian, Amin Jafarniya, Mohammad Fayyaz, Saeed Mohammad |
|---|---|
| Format: | Article |
| Language: | fas |
| Published: |
Assist. Prof. Dr. Roohollah Taherkhani
2020-11-01
|
| Series: | مهندسی و مدیریت ساخت |
| Subjects: | |
| Online Access: | https://www.jecm.ir/article_156051_b29ab0d39055cefb9c5a08d033d1cf7b.pdf |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Single-Level Station Complex Structure for Application of Through Driving Construction Method
by: A. О. Kolikov, et al.
Published: (2020-10-01) -
Key Technologies for the Application of Prefabricated Interior Partition Walls in Metro Station Projects
by: LI Tao, et al.
Published: (2025-05-01) -
Metro Tunnel Shield Construction in Highly Water-rich Karst Strata
by: ZHAO Heming
Published: (2025-03-01) -
Key Technologies for Large-span Mined Metro Tunnel Construction Using Superimposed Arch-wall Method
by: HU Qifan, et al.
Published: (2025-07-01) -
The Impact of Different Excavation Support Structures on the Deformation and Stability of Adjacent Station and Tunnels
by: Zhitong Mao, et al.
Published: (2025-02-01)