Back-Silting Characteristics of Foundation Trench Excavation in an Ultra-Wide Inland Immersed Tunnel and Its Impacts on Slope Stability: A Case Study of the Tanzhou Waterway in Shunde
During the construction of a large immersed tunnel crossing an ultra-wide inland river, the long drying time after the excavation of the foundation trench and changes in river flow velocity result in the river carrying a large amount of sediment into the foundation trench and the slope, increasing i...