Solving Permutation Flow Shop Scheduling Problem with Sequence-Independent Setup Time
In this paper, we study the resolution of a permutation flow shop problem with sequence-independent setup time. The objective is to minimize the maximum of job completion time, also called the makespan. In this contribution, we propose three methods of resolution, a mixed-integer linear programming...
Saved in:
| Main Authors: | , , |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2020-01-01
|
| Series: | Journal of Applied Mathematics |
| Online Access: | http://dx.doi.org/10.1155/2020/7132469 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!