Disturbance Response and Control of Shield Construction Adjacent to Bridge and High-rise Buildings

[Objective]The tunnel between Shengchanlu Station and Lihuanglu Station on Jinan Metro Line 2 passes in close proximity to the pile foundations of an elevated bridge and the Eurasia Electronics Building complex. To ensure the smooth implementation of shield tunneling and the safety of existing struc...

Full description

Saved in:
Bibliographic Details
Main Authors: CHONG Jixin, XU Qianwei, HE Xiang, ZHANG Kun, XUE Hairu, LIU Yi
Format: Article
Language:zho
Published: Urban Mass Transit Magazine Press 2024-12-01
Series:Chengshi guidao jiaotong yanjiu
Subjects:
Online Access:https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2024.12.024.html
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850061816759058432
author CHONG Jixin
XU Qianwei
HE Xiang
ZHANG Kun
XUE Hairu
LIU Yi
author_facet CHONG Jixin
XU Qianwei
HE Xiang
ZHANG Kun
XUE Hairu
LIU Yi
author_sort CHONG Jixin
collection DOAJ
description [Objective]The tunnel between Shengchanlu Station and Lihuanglu Station on Jinan Metro Line 2 passes in close proximity to the pile foundations of an elevated bridge and the Eurasia Electronics Building complex. To ensure the smooth implementation of shield tunneling and the safety of existing structures, it is necessary to study the structural response mechanism of the surrounding soil and buildings due to shield tunnel side-passing construction. [Method]Using finite element simulation, the deformation of adjacent bridge foundation, pile foundation, and ground surface before and after reinforcement during the right and left line shield tunnel crossings is examined. A numerical simulation process is comparatively analyzed with reference to field monitoring data. [Result & Conclusion]When the construction interval between the left and right lines is within 200 rings, the disturbance effect from dual-line construction may have a superimposed impact, potentially causing excessive deformation of the surrounding soil and building structures, thus jeopardizing the usage safety. Implementing secondary grouting reinforcement within 3 m radius around the tunnel reduces the negative bending moment in the building floor slabs and the columns closest to the tunnel by 45.01%, while reducing the extent and magnitude of ground surface and surrounding building deformation within the design limits, indicating that the secondary grouting can effectively mitigate the stratum disturbance effects caused by shield tunneling. Field monitoring results confirm that soil and pile foundation deformations remain within acceptable limits during the shield tunneling.
format Article
id doaj-art-84fbb1265fad4ff8b14cccd25bbc1b52
institution DOAJ
issn 1007-869X
language zho
publishDate 2024-12-01
publisher Urban Mass Transit Magazine Press
record_format Article
series Chengshi guidao jiaotong yanjiu
spelling doaj-art-84fbb1265fad4ff8b14cccd25bbc1b522025-08-20T02:50:05ZzhoUrban Mass Transit Magazine PressChengshi guidao jiaotong yanjiu1007-869X2024-12-01271214615210.16037/j.1007-869x.2024.12.024Disturbance Response and Control of Shield Construction Adjacent to Bridge and High-rise BuildingsCHONG Jixin0XU Qianwei1HE Xiang2ZHANG Kun3XUE Hairu4LIU Yi5Jinan Rail Transit Group Co., Ltd., 250101, Jinan, ChinaKey Laboratory of Road and Traffic Engineering of Ministry of Education, Tongji University, 201804, Shanghai, ChinaKey Laboratory of Road and Traffic Engineering of Ministry of Education, Tongji University, 201804, Shanghai, ChinaJinan Rail Transit Group Co., Ltd., 250101, Jinan, ChinaChina Railway Tenth Bureau Group First Engineering Co., Ltd., 250001, Jinan, ChinaJinan Rail Transit Group Co., Ltd., 250101, Jinan, China[Objective]The tunnel between Shengchanlu Station and Lihuanglu Station on Jinan Metro Line 2 passes in close proximity to the pile foundations of an elevated bridge and the Eurasia Electronics Building complex. To ensure the smooth implementation of shield tunneling and the safety of existing structures, it is necessary to study the structural response mechanism of the surrounding soil and buildings due to shield tunnel side-passing construction. [Method]Using finite element simulation, the deformation of adjacent bridge foundation, pile foundation, and ground surface before and after reinforcement during the right and left line shield tunnel crossings is examined. A numerical simulation process is comparatively analyzed with reference to field monitoring data. [Result & Conclusion]When the construction interval between the left and right lines is within 200 rings, the disturbance effect from dual-line construction may have a superimposed impact, potentially causing excessive deformation of the surrounding soil and building structures, thus jeopardizing the usage safety. Implementing secondary grouting reinforcement within 3 m radius around the tunnel reduces the negative bending moment in the building floor slabs and the columns closest to the tunnel by 45.01%, while reducing the extent and magnitude of ground surface and surrounding building deformation within the design limits, indicating that the secondary grouting can effectively mitigate the stratum disturbance effects caused by shield tunneling. Field monitoring results confirm that soil and pile foundation deformations remain within acceptable limits during the shield tunneling.https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2024.12.024.htmlurban rail transitshield tunneladjacent constructiondisturbance response and control
spellingShingle CHONG Jixin
XU Qianwei
HE Xiang
ZHANG Kun
XUE Hairu
LIU Yi
Disturbance Response and Control of Shield Construction Adjacent to Bridge and High-rise Buildings
Chengshi guidao jiaotong yanjiu
urban rail transit
shield tunnel
adjacent construction
disturbance response and control
title Disturbance Response and Control of Shield Construction Adjacent to Bridge and High-rise Buildings
title_full Disturbance Response and Control of Shield Construction Adjacent to Bridge and High-rise Buildings
title_fullStr Disturbance Response and Control of Shield Construction Adjacent to Bridge and High-rise Buildings
title_full_unstemmed Disturbance Response and Control of Shield Construction Adjacent to Bridge and High-rise Buildings
title_short Disturbance Response and Control of Shield Construction Adjacent to Bridge and High-rise Buildings
title_sort disturbance response and control of shield construction adjacent to bridge and high rise buildings
topic urban rail transit
shield tunnel
adjacent construction
disturbance response and control
url https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2024.12.024.html
work_keys_str_mv AT chongjixin disturbanceresponseandcontrolofshieldconstructionadjacenttobridgeandhighrisebuildings
AT xuqianwei disturbanceresponseandcontrolofshieldconstructionadjacenttobridgeandhighrisebuildings
AT hexiang disturbanceresponseandcontrolofshieldconstructionadjacenttobridgeandhighrisebuildings
AT zhangkun disturbanceresponseandcontrolofshieldconstructionadjacenttobridgeandhighrisebuildings
AT xuehairu disturbanceresponseandcontrolofshieldconstructionadjacenttobridgeandhighrisebuildings
AT liuyi disturbanceresponseandcontrolofshieldconstructionadjacenttobridgeandhighrisebuildings