A Novel Approach for Risk Assessment of Building Damage via Metro Tunnel Construction

The impact of shield construction on the surrounding buildings involves numerous factors, and the factors are uncertain and ambiguous, which have a great impact on the progress and safety of the project. Therefore, this paper developed a systematic approach for the risk assessment of existing buildi...

Full description

Saved in:
Bibliographic Details
Main Authors: Hai-Lin Wang, Yuan Liu, Yuan Jiang, Zhi-Teng Wang
Format: Article
Language:English
Published: Wiley 2022-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2022/8448223
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832548771290939392
author Hai-Lin Wang
Yuan Liu
Yuan Jiang
Zhi-Teng Wang
author_facet Hai-Lin Wang
Yuan Liu
Yuan Jiang
Zhi-Teng Wang
author_sort Hai-Lin Wang
collection DOAJ
description The impact of shield construction on the surrounding buildings involves numerous factors, and the factors are uncertain and ambiguous, which have a great impact on the progress and safety of the project. Therefore, this paper developed a systematic approach for the risk assessment of existing buildings adjacent to tunneling excavation. Firstly, a risk assessment system for adjacent buildings in shield tunneling environments was proposed. Secondly, the weighting of factors was calculated by Pythagorean fuzzy AHP. Then, the VIKOR method was used to divide the risk of existing buildings adjacent to tunneling excavation into five uneven levels. Finally, the extended VIKOR with interval numbers was first introduced in risk assessment of building adjacent to tunneling environment to determine a specific building risk level. The proposed approach was successfully applied to the risk assessment of several buildings adjacent to tunnel construction of Metro Line 4 of Changsha. The accuracy and effectiveness of the constructed new approach were verified by comparing the obtained evaluation results with the actual situation on-site. This work provides a new method for similar engineering risk assessment.
format Article
id doaj-art-84d00c2e236c48c0bf764b12bb70e880
institution Kabale University
issn 1687-8094
language English
publishDate 2022-01-01
publisher Wiley
record_format Article
series Advances in Civil Engineering
spelling doaj-art-84d00c2e236c48c0bf764b12bb70e8802025-02-03T06:13:04ZengWileyAdvances in Civil Engineering1687-80942022-01-01202210.1155/2022/8448223A Novel Approach for Risk Assessment of Building Damage via Metro Tunnel ConstructionHai-Lin Wang0Yuan Liu1Yuan Jiang2Zhi-Teng Wang3Hunan Provincial Communications PlanningCollege of Civil EngineeringHunan Provincial Communications PlanningCollege of Civil EngineeringThe impact of shield construction on the surrounding buildings involves numerous factors, and the factors are uncertain and ambiguous, which have a great impact on the progress and safety of the project. Therefore, this paper developed a systematic approach for the risk assessment of existing buildings adjacent to tunneling excavation. Firstly, a risk assessment system for adjacent buildings in shield tunneling environments was proposed. Secondly, the weighting of factors was calculated by Pythagorean fuzzy AHP. Then, the VIKOR method was used to divide the risk of existing buildings adjacent to tunneling excavation into five uneven levels. Finally, the extended VIKOR with interval numbers was first introduced in risk assessment of building adjacent to tunneling environment to determine a specific building risk level. The proposed approach was successfully applied to the risk assessment of several buildings adjacent to tunnel construction of Metro Line 4 of Changsha. The accuracy and effectiveness of the constructed new approach were verified by comparing the obtained evaluation results with the actual situation on-site. This work provides a new method for similar engineering risk assessment.http://dx.doi.org/10.1155/2022/8448223
spellingShingle Hai-Lin Wang
Yuan Liu
Yuan Jiang
Zhi-Teng Wang
A Novel Approach for Risk Assessment of Building Damage via Metro Tunnel Construction
Advances in Civil Engineering
title A Novel Approach for Risk Assessment of Building Damage via Metro Tunnel Construction
title_full A Novel Approach for Risk Assessment of Building Damage via Metro Tunnel Construction
title_fullStr A Novel Approach for Risk Assessment of Building Damage via Metro Tunnel Construction
title_full_unstemmed A Novel Approach for Risk Assessment of Building Damage via Metro Tunnel Construction
title_short A Novel Approach for Risk Assessment of Building Damage via Metro Tunnel Construction
title_sort novel approach for risk assessment of building damage via metro tunnel construction
url http://dx.doi.org/10.1155/2022/8448223
work_keys_str_mv AT hailinwang anovelapproachforriskassessmentofbuildingdamageviametrotunnelconstruction
AT yuanliu anovelapproachforriskassessmentofbuildingdamageviametrotunnelconstruction
AT yuanjiang anovelapproachforriskassessmentofbuildingdamageviametrotunnelconstruction
AT zhitengwang anovelapproachforriskassessmentofbuildingdamageviametrotunnelconstruction
AT hailinwang novelapproachforriskassessmentofbuildingdamageviametrotunnelconstruction
AT yuanliu novelapproachforriskassessmentofbuildingdamageviametrotunnelconstruction
AT yuanjiang novelapproachforriskassessmentofbuildingdamageviametrotunnelconstruction
AT zhitengwang novelapproachforriskassessmentofbuildingdamageviametrotunnelconstruction