Design of the Rapid Rail-replacing Car

This article introduced the structure, performance parameters, main components and calculation of the rapid rail-replacingcar. The rail-replacing car replaced the old rail in the seamless track with new rail utilizing the open window time, and can self run formaintenance operation. Compared with the...

Full description

Saved in:
Bibliographic Details
Main Author: WANG Qiang
Format: Article
Language:zho
Published: Editorial Department of Electric Drive for Locomotives 2015-01-01
Series:机车电传动
Subjects:
Online Access:http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2015.03.012
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850142604672368640
author WANG Qiang
author_facet WANG Qiang
author_sort WANG Qiang
collection DOAJ
description This article introduced the structure, performance parameters, main components and calculation of the rapid rail-replacingcar. The rail-replacing car replaced the old rail in the seamless track with new rail utilizing the open window time, and can self run formaintenance operation. Compared with the traditional rail-replacing mode, it can minimize the open window time, reduce the manualoperation strength, and improve the rail-replacing efficiency.
format Article
id doaj-art-8185228ea5b140c0968a8df309ff558b
institution OA Journals
issn 1000-128X
language zho
publishDate 2015-01-01
publisher Editorial Department of Electric Drive for Locomotives
record_format Article
series 机车电传动
spelling doaj-art-8185228ea5b140c0968a8df309ff558b2025-08-20T02:29:02ZzhoEditorial Department of Electric Drive for Locomotives机车电传动1000-128X2015-01-01454820905732Design of the Rapid Rail-replacing CarWANG QiangThis article introduced the structure, performance parameters, main components and calculation of the rapid rail-replacingcar. The rail-replacing car replaced the old rail in the seamless track with new rail utilizing the open window time, and can self run formaintenance operation. Compared with the traditional rail-replacing mode, it can minimize the open window time, reduce the manualoperation strength, and improve the rail-replacing efficiency.http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2015.03.012rapid rail-replacing cartraction characteristicfasteningcar bodyFEAvehicle dynamics
spellingShingle WANG Qiang
Design of the Rapid Rail-replacing Car
机车电传动
rapid rail-replacing car
traction characteristic
fastening
car body
FEA
vehicle dynamics
title Design of the Rapid Rail-replacing Car
title_full Design of the Rapid Rail-replacing Car
title_fullStr Design of the Rapid Rail-replacing Car
title_full_unstemmed Design of the Rapid Rail-replacing Car
title_short Design of the Rapid Rail-replacing Car
title_sort design of the rapid rail replacing car
topic rapid rail-replacing car
traction characteristic
fastening
car body
FEA
vehicle dynamics
url http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2015.03.012
work_keys_str_mv AT wangqiang designoftherapidrailreplacingcar