Four-quadrant Mine Converter Based on Fuzzy-PID Controller

In order to realize four-quadrant mine converter with 1 140 V, the diode rectifier is replaced by the voltage source PWM rectifier ( VSR ) with double closed-loop arithmetic based on the Fuzzy-PID. Var analyzing VSR model which is established in Simulink by using Fuzzy tools of Matlab, the performan...

Full description

Saved in:
Bibliographic Details
Main Authors: NIU Ying, ZHANG Shaoyun, CHEN Guangzan, JIANG Yaowei
Format: Article
Language:zho
Published: Editorial Office of Control and Information Technology 2011-01-01
Series:Kongzhi Yu Xinxi Jishu
Subjects:
Online Access:http://ctet.csrzic.com/thesisDetails#10.13889/j.issn.2095-3631.2011.06.008
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:In order to realize four-quadrant mine converter with 1 140 V, the diode rectifier is replaced by the voltage source PWM rectifier ( VSR ) with double closed-loop arithmetic based on the Fuzzy-PID. Var analyzing VSR model which is established in Simulink by using Fuzzy tools of Matlab, the performance of VSR system can be simulated and the feasibility of this arithmetic is proved, and then experiment results show the validity and correctness of the control method.
ISSN:2096-5427