Four-quadrant Mine Converter Based on Fuzzy-PID Controller
In order to realize four-quadrant mine converter with 1 140 V, the diode rectifier is replaced by the voltage source PWM rectifier ( VSR ) with double closed-loop arithmetic based on the Fuzzy-PID. Var analyzing VSR model which is established in Simulink by using Fuzzy tools of Matlab, the performan...
Saved in:
| Main Authors: | , , , |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Editorial Office of Control and Information Technology
2011-01-01
|
| Series: | Kongzhi Yu Xinxi Jishu |
| Subjects: | |
| Online Access: | http://ctet.csrzic.com/thesisDetails#10.13889/j.issn.2095-3631.2011.06.008 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Summary: | In order to realize four-quadrant mine converter with 1 140 V, the diode rectifier is replaced by the voltage source PWM rectifier ( VSR ) with double closed-loop arithmetic based on the Fuzzy-PID. Var analyzing VSR model which is established in Simulink by using Fuzzy tools of Matlab, the performance of VSR system can be simulated and the feasibility of this arithmetic is proved, and then experiment results show the validity and correctness of the control method. |
|---|---|
| ISSN: | 2096-5427 |