A Hybrid Heuristic Algorithm for Ship Block Construction Space Scheduling Problem
Ship block construction space is an important bottleneck resource in the process of shipbuilding, so the production scheduling optimization is a key technology to improve the efficiency of shipbuilding. With respect to ship block construction space scheduling problem, a hybrid heuristic algorithm is...
Saved in:
Main Authors: | Shicheng Hu, Tengjiao Liu, Song Wang, Yonggui Kao, Xuedong Sun |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2015-01-01
|
Series: | Discrete Dynamics in Nature and Society |
Online Access: | http://dx.doi.org/10.1155/2015/841637 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A Heuristic Genetic Algorithm for Regional Targets’ Small Satellite Image Downlink Scheduling Problem
by: Yan-Jie Song, et al.
Published: (2019-01-01) -
Obstacle Avoidance for Ship Navigation Safety Combining Heuristic Search Algorithm and Improved ACO Algorithm
by: Dan Wang, et al.
Published: (2024-12-01) -
Hyper-Heuristics and Scheduling Problems: Strategies, Application Areas, and Performance Metrics
by: Alonso Vela, et al.
Published: (2025-01-01) -
A Hybrid Genetic Algorithm for Satellite Image Downlink Scheduling Problem
by: Bingyu Song, et al.
Published: (2018-01-01) -
A Hybrid Simulated Annealing Heuristic for Multistage Heterogeneous Fleet Scheduling with Fleet Sizing Decisions
by: Bing Li, et al.
Published: (2019-01-01)