Stability Control and Quick Retaining Technology of Gob-Side Entry: A Case Study

In Chinese coal mines, gob-side entry retaining, an efficient technique for coal mining, has been widely used. However, severe roadway deformation and slow retaining speed have gravely restricted the popularization and its application. Hence, in order to solve the existing problems, the deformation...

Full description

Saved in:
Bibliographic Details
Main Authors: Hengjie Luan, Yujing Jiang, Lujie Zhou, Huili Lin
Format: Article
Language:English
Published: Wiley 2018-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2018/7357320
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832556428922978304
author Hengjie Luan
Yujing Jiang
Lujie Zhou
Huili Lin
author_facet Hengjie Luan
Yujing Jiang
Lujie Zhou
Huili Lin
author_sort Hengjie Luan
collection DOAJ
description In Chinese coal mines, gob-side entry retaining, an efficient technique for coal mining, has been widely used. However, severe roadway deformation and slow retaining speed have gravely restricted the popularization and its application. Hence, in order to solve the existing problems, the deformation mechanism of gob-side entry was studied. Then, a new approach for gob-side entry retaining technique (GERT) was proposed to increase the speed of gob-side entry retaining. Finally, the application effect of the new GERT method was tested and analysed. The results show that the rotation and subsidence of roof key block B lead to severe deformation of roadway. And the proposed gob-side entry stability control technology can affectively resist the severe roadway deformation. Compared with the conventional support method for gob-side entry retaining, GERT has completed the complex wall construction work in advance, thereby simplifying the process of gob-side entry retaining and increasing the speed of gob-side entry retaining. When retaining the entry in panel 183U04 with the new support method, the entry retaining speed significantly improved from 0.25 m/h to 1.0 m/h compared with the traditional method, and then the problem of gob-side entry severe deformation was solved.
format Article
id doaj-art-806afe88c1ce4dbfab8cdc124dc963e2
institution Kabale University
issn 1687-8086
1687-8094
language English
publishDate 2018-01-01
publisher Wiley
record_format Article
series Advances in Civil Engineering
spelling doaj-art-806afe88c1ce4dbfab8cdc124dc963e22025-02-03T05:45:27ZengWileyAdvances in Civil Engineering1687-80861687-80942018-01-01201810.1155/2018/73573207357320Stability Control and Quick Retaining Technology of Gob-Side Entry: A Case StudyHengjie Luan0Yujing Jiang1Lujie Zhou2Huili Lin3State Key Laboratory of Mining Disaster Prevention and Control Co-founded By Shandong Province and the Ministry of Science and Technology, Shandong University of Science and Technology, Qingdao 266590, ChinaState Key Laboratory of Mining Disaster Prevention and Control Co-founded By Shandong Province and the Ministry of Science and Technology, Shandong University of Science and Technology, Qingdao 266590, ChinaState Key Laboratory of Mining Disaster Prevention and Control Co-founded By Shandong Province and the Ministry of Science and Technology, Shandong University of Science and Technology, Qingdao 266590, ChinaChina Coal Research Institute, Beijing 100013, ChinaIn Chinese coal mines, gob-side entry retaining, an efficient technique for coal mining, has been widely used. However, severe roadway deformation and slow retaining speed have gravely restricted the popularization and its application. Hence, in order to solve the existing problems, the deformation mechanism of gob-side entry was studied. Then, a new approach for gob-side entry retaining technique (GERT) was proposed to increase the speed of gob-side entry retaining. Finally, the application effect of the new GERT method was tested and analysed. The results show that the rotation and subsidence of roof key block B lead to severe deformation of roadway. And the proposed gob-side entry stability control technology can affectively resist the severe roadway deformation. Compared with the conventional support method for gob-side entry retaining, GERT has completed the complex wall construction work in advance, thereby simplifying the process of gob-side entry retaining and increasing the speed of gob-side entry retaining. When retaining the entry in panel 183U04 with the new support method, the entry retaining speed significantly improved from 0.25 m/h to 1.0 m/h compared with the traditional method, and then the problem of gob-side entry severe deformation was solved.http://dx.doi.org/10.1155/2018/7357320
spellingShingle Hengjie Luan
Yujing Jiang
Lujie Zhou
Huili Lin
Stability Control and Quick Retaining Technology of Gob-Side Entry: A Case Study
Advances in Civil Engineering
title Stability Control and Quick Retaining Technology of Gob-Side Entry: A Case Study
title_full Stability Control and Quick Retaining Technology of Gob-Side Entry: A Case Study
title_fullStr Stability Control and Quick Retaining Technology of Gob-Side Entry: A Case Study
title_full_unstemmed Stability Control and Quick Retaining Technology of Gob-Side Entry: A Case Study
title_short Stability Control and Quick Retaining Technology of Gob-Side Entry: A Case Study
title_sort stability control and quick retaining technology of gob side entry a case study
url http://dx.doi.org/10.1155/2018/7357320
work_keys_str_mv AT hengjieluan stabilitycontrolandquickretainingtechnologyofgobsideentryacasestudy
AT yujingjiang stabilitycontrolandquickretainingtechnologyofgobsideentryacasestudy
AT lujiezhou stabilitycontrolandquickretainingtechnologyofgobsideentryacasestudy
AT huililin stabilitycontrolandquickretainingtechnologyofgobsideentryacasestudy