Realization of Technique of Network Assambling Combining VDSL with Telecommunication in Lubao Flood Control Headquarters
Saved in:
Main Authors: | ZHONG Jin-xiong, LI Kang |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2005-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47666603&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Experience in Project Management of Lubao Sluice
by: PAN Jin-jiang, et al.
Published: (2001-01-01) -
Safety Appraisal of Lubao Sluice
by: 潘锦江
Published: (2003-01-01) -
Flood Control and Drought Relief Situation in the Pearl River Basin and the Overall Work Agenda of the Headquarter in 2006
by: YUE Zhong-ming
Published: (2006-01-01) -
Assambly of Spiral Case of Baise Hydropower Station
by: LI Xing-wen
Published: (2006-01-01) -
Study on FTTx-Oriented VDSL2 Vectoring Technology and Application
by: Haolin Li, et al.
Published: (2014-08-01)