Life Cycle Cost Analysis of Ashore Marine Engine Room

This paper aims to present a method for comparing decision options for the ashore marine engine room. Based on the life cycle cost system, the life cycle stages are divided into design, acquisition, installation, operation, maintenance, and scrapping. A model of the life cycle cost of ashore marine...

Full description

Saved in:
Bibliographic Details
Main Authors: Long Lyu, Long Huang, Jing Yu
Format: Article
Language:English
Published: Wiley 2022-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2022/7237281
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832553690639106048
author Long Lyu
Long Huang
Jing Yu
author_facet Long Lyu
Long Huang
Jing Yu
author_sort Long Lyu
collection DOAJ
description This paper aims to present a method for comparing decision options for the ashore marine engine room. Based on the life cycle cost system, the life cycle stages are divided into design, acquisition, installation, operation, maintenance, and scrapping. A model of the life cycle cost of ashore marine engine room considering the time value of money was developed, and a calculation method for sensitivity analysis was developed. Regarding the actual case, the life cycle cost of the two options was estimated, the sensitivity of the cost of the two options was analyzed, and control recommendations were made. The results show that Option 2, with the highest initial investment, is the optimal solution, attributed to using an advanced two-stroke diesel engine with reduced operation and maintenance costs. This will be useful for reference by maritime academies.
format Article
id doaj-art-8036f8bf35ab48db9ad4ead625e684b1
institution Kabale University
issn 1687-8094
language English
publishDate 2022-01-01
publisher Wiley
record_format Article
series Advances in Civil Engineering
spelling doaj-art-8036f8bf35ab48db9ad4ead625e684b12025-02-03T05:53:29ZengWileyAdvances in Civil Engineering1687-80942022-01-01202210.1155/2022/7237281Life Cycle Cost Analysis of Ashore Marine Engine RoomLong Lyu0Long Huang1Jing Yu2School of Marine Intelligent EngineeringSchool of Marine Intelligent EngineeringSchool of Marine Intelligent EngineeringThis paper aims to present a method for comparing decision options for the ashore marine engine room. Based on the life cycle cost system, the life cycle stages are divided into design, acquisition, installation, operation, maintenance, and scrapping. A model of the life cycle cost of ashore marine engine room considering the time value of money was developed, and a calculation method for sensitivity analysis was developed. Regarding the actual case, the life cycle cost of the two options was estimated, the sensitivity of the cost of the two options was analyzed, and control recommendations were made. The results show that Option 2, with the highest initial investment, is the optimal solution, attributed to using an advanced two-stroke diesel engine with reduced operation and maintenance costs. This will be useful for reference by maritime academies.http://dx.doi.org/10.1155/2022/7237281
spellingShingle Long Lyu
Long Huang
Jing Yu
Life Cycle Cost Analysis of Ashore Marine Engine Room
Advances in Civil Engineering
title Life Cycle Cost Analysis of Ashore Marine Engine Room
title_full Life Cycle Cost Analysis of Ashore Marine Engine Room
title_fullStr Life Cycle Cost Analysis of Ashore Marine Engine Room
title_full_unstemmed Life Cycle Cost Analysis of Ashore Marine Engine Room
title_short Life Cycle Cost Analysis of Ashore Marine Engine Room
title_sort life cycle cost analysis of ashore marine engine room
url http://dx.doi.org/10.1155/2022/7237281
work_keys_str_mv AT longlyu lifecyclecostanalysisofashoremarineengineroom
AT longhuang lifecyclecostanalysisofashoremarineengineroom
AT jingyu lifecyclecostanalysisofashoremarineengineroom