Leveraging BIM for Proactive Dispute Avoidance in Construction Projects
The construction industry faces persistent challenges from disputes and claims, leading to delays, cost overruns, and strained stakeholder relationships. This study proposes a strategic framework that integrates building information modeling (BIM) as a proactive tool for dispute avoidance. Using a c...
Saved in:
| Main Authors: | Mohamed Tantawy, Mohamed M. Kosbar, Samar M. Nour, N. Mansour, A. Ehab |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
MDPI AG
2025-04-01
|
| Series: | Buildings |
| Subjects: | |
| Online Access: | https://www.mdpi.com/2075-5309/15/9/1401 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Closing the loop on water supply and sanitation: The dynamic links between population, ecosystems, and economic interactions
by: Jean M P De Paula, et al.
Published: (2025-06-01) -
Using qualitative systems mapping to analyze the linkages between the behavioral and social (BeSD) determinants of routine childhood immunization in LMICs
by: Lalitha Vadrevu, et al.
Published: (2024-12-01) -
Mapping the interactions of critical factors in China’s first-contact healthcare systems using causal loop diagrams
by: Wenjun He, et al.
Published: (2025-08-01) -
Pre-Contract Measures to Avoid Potential Disputes in the New Zealand Construction Industry
by: Pramod Malaka Silva, et al.
Published: (2025-07-01) -
Mapping Complexity: Refugee Students’ Participation and Retention in Education Through Community-Based System Dynamics
by: Nidan Oyman Bozkurt
Published: (2025-07-01)