Foreclosing Infrastructure: On Permit Time and the Permission to Transit From Fossil to Renewable Fuels
Building on research on the time and temporality of infrastructure and climate, this article focuses on permit time, or the environmental permit as a temporal form of control. Based on an analysis of three environmental permit procedures in Sweden related to the fuel transition, the article argues t...
Saved in:
Main Author: | Marie Widengård |
---|---|
Format: | Article |
Language: | English |
Published: |
University of Bologna – Dipartimento di Filosofia e Comunicazione
2025-02-01
|
Series: | Tecnoscienza |
Subjects: | |
Online Access: | https://tecnoscienza.unibo.it/article/view/18283 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Infrastructured Timescapes of the Anthropocene and Climate Change
by: Claudio Coletta
Published: (2025-02-01) -
Tides of Time: The Dutch Delta Works as Time-Mediating Climate Adaptation Infrastructure
by: Huub Dijstelbloem, et al.
Published: (2025-02-01) -
BRIDGING ENVIRONMENTAL IMPACT OF FOSSIL FUEL ENERGY: THE CONTRIBUTING ROLE OF ALTERNATIVE ENERGY
by: ADEKOMAYA OLUDAISI, et al.
Published: (2017-06-01) -
Time, Infrastructure and Knowledge: Rethinking Temporality in the Anthropocene
by: Vando Borghi, et al.
Published: (2025-02-01) -
Interdependency classification: a framework for infrastructure resilience
by: Negin Shamsi, et al.
Published: (2025-01-01)