Advancing AI-Powered BIM for Circularity in Construction in the UK and Turkiye: State-of-the-Art Review and Capability Maturity Modelling
The promotion of uptake of building information modelling (BIM) and circular economy (CE) in the UK and Turkiye construction sectors can be enhanced with the addition of AI. Thus, AI-enabled BIM and CE must be addressed from the viewpoint of current practices and capabilities. This study conducted a...
Saved in:
| Main Authors: | , , , , , , , |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
MDPI AG
2025-04-01
|
| Series: | Buildings |
| Subjects: | |
| Online Access: | https://www.mdpi.com/2075-5309/15/8/1224 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| _version_ | 1849712460713426944 |
|---|---|
| author | Temitope Omotayo Ali Murat Tanyer Jiamei Deng Agnes Kaima Anderson Akponeware Mehmet Koray Pekericli Shariful Shikder Mercy Ogunnusi |
| author_facet | Temitope Omotayo Ali Murat Tanyer Jiamei Deng Agnes Kaima Anderson Akponeware Mehmet Koray Pekericli Shariful Shikder Mercy Ogunnusi |
| author_sort | Temitope Omotayo |
| collection | DOAJ |
| description | The promotion of uptake of building information modelling (BIM) and circular economy (CE) in the UK and Turkiye construction sectors can be enhanced with the addition of AI. Thus, AI-enabled BIM and CE must be addressed from the viewpoint of current practices and capabilities. This study conducted a comparative study of capability maturity modelling (CMM) backed by a state-of-the-art (SOTA) review of 24 peer-reviewed publications via a validatory approach using a focus group webinar of eight experts in the UK and Turkiye. The findings, as extracted through a validated CMM framework of seven dimensions, were used to identify the position of the UK and Turkiye in terms of AI in BIM and CE. It was discovered that the UK is in a position regarding adoption, government policies and incentives at a defined level. AI growth is required in terms of technological advancement, education and training, industry readiness, cultural attitudes and resistance because they are in a managed phase. It was confirmed that Turkiye is at the initial stage of AI adoption, education, training, incentives, policies, technology and cultural attitudes. The originality of this study lies in the recommendations for a 10-year CMM adoption timeframe towards an optimised level. The conclusions of this manuscript will influence government, education, research and technological policies in the UK and Turkiye. |
| format | Article |
| id | doaj-art-7d91c78b937143c7869d1007ca5e073c |
| institution | DOAJ |
| issn | 2075-5309 |
| language | English |
| publishDate | 2025-04-01 |
| publisher | MDPI AG |
| record_format | Article |
| series | Buildings |
| spelling | doaj-art-7d91c78b937143c7869d1007ca5e073c2025-08-20T03:14:16ZengMDPI AGBuildings2075-53092025-04-01158122410.3390/buildings15081224Advancing AI-Powered BIM for Circularity in Construction in the UK and Turkiye: State-of-the-Art Review and Capability Maturity ModellingTemitope Omotayo0Ali Murat Tanyer1Jiamei Deng2Agnes Kaima3Anderson Akponeware4Mehmet Koray Pekericli5Shariful Shikder6Mercy Ogunnusi7School of Built Environment, Engineering and Computing, Leeds Beckett University, Leeds LS2 8AG, UKDepartment of Architecture, Middle East Technical University, Dumlupınar Blv. 1/6 D:133, 06800 Çankaya, TürkiyeSchool of Built Environment, Engineering and Computing, Leeds Beckett University, Leeds LS2 8AG, UKSchool of Built Environment, Engineering and Computing, Leeds Beckett University, Leeds LS2 8AG, UKSchool of Built Environment, Engineering and Computing, Leeds Beckett University, Leeds LS2 8AG, UKDepartment of Architecture, Middle East Technical University, Dumlupınar Blv. 1/6 D:133, 06800 Çankaya, TürkiyeSchool of Built Environment, Engineering and Computing, Leeds Beckett University, Leeds LS2 8AG, UKSchool of Built Environment, Engineering and Computing, Leeds Beckett University, Leeds LS2 8AG, UKThe promotion of uptake of building information modelling (BIM) and circular economy (CE) in the UK and Turkiye construction sectors can be enhanced with the addition of AI. Thus, AI-enabled BIM and CE must be addressed from the viewpoint of current practices and capabilities. This study conducted a comparative study of capability maturity modelling (CMM) backed by a state-of-the-art (SOTA) review of 24 peer-reviewed publications via a validatory approach using a focus group webinar of eight experts in the UK and Turkiye. The findings, as extracted through a validated CMM framework of seven dimensions, were used to identify the position of the UK and Turkiye in terms of AI in BIM and CE. It was discovered that the UK is in a position regarding adoption, government policies and incentives at a defined level. AI growth is required in terms of technological advancement, education and training, industry readiness, cultural attitudes and resistance because they are in a managed phase. It was confirmed that Turkiye is at the initial stage of AI adoption, education, training, incentives, policies, technology and cultural attitudes. The originality of this study lies in the recommendations for a 10-year CMM adoption timeframe towards an optimised level. The conclusions of this manuscript will influence government, education, research and technological policies in the UK and Turkiye.https://www.mdpi.com/2075-5309/15/8/1224AIBIMconstruction sectorcircular economyUKTurkiye |
| spellingShingle | Temitope Omotayo Ali Murat Tanyer Jiamei Deng Agnes Kaima Anderson Akponeware Mehmet Koray Pekericli Shariful Shikder Mercy Ogunnusi Advancing AI-Powered BIM for Circularity in Construction in the UK and Turkiye: State-of-the-Art Review and Capability Maturity Modelling Buildings AI BIM construction sector circular economy UK Turkiye |
| title | Advancing AI-Powered BIM for Circularity in Construction in the UK and Turkiye: State-of-the-Art Review and Capability Maturity Modelling |
| title_full | Advancing AI-Powered BIM for Circularity in Construction in the UK and Turkiye: State-of-the-Art Review and Capability Maturity Modelling |
| title_fullStr | Advancing AI-Powered BIM for Circularity in Construction in the UK and Turkiye: State-of-the-Art Review and Capability Maturity Modelling |
| title_full_unstemmed | Advancing AI-Powered BIM for Circularity in Construction in the UK and Turkiye: State-of-the-Art Review and Capability Maturity Modelling |
| title_short | Advancing AI-Powered BIM for Circularity in Construction in the UK and Turkiye: State-of-the-Art Review and Capability Maturity Modelling |
| title_sort | advancing ai powered bim for circularity in construction in the uk and turkiye state of the art review and capability maturity modelling |
| topic | AI BIM construction sector circular economy UK Turkiye |
| url | https://www.mdpi.com/2075-5309/15/8/1224 |
| work_keys_str_mv | AT temitopeomotayo advancingaipoweredbimforcircularityinconstructionintheukandturkiyestateoftheartreviewandcapabilitymaturitymodelling AT alimurattanyer advancingaipoweredbimforcircularityinconstructionintheukandturkiyestateoftheartreviewandcapabilitymaturitymodelling AT jiameideng advancingaipoweredbimforcircularityinconstructionintheukandturkiyestateoftheartreviewandcapabilitymaturitymodelling AT agneskaima advancingaipoweredbimforcircularityinconstructionintheukandturkiyestateoftheartreviewandcapabilitymaturitymodelling AT andersonakponeware advancingaipoweredbimforcircularityinconstructionintheukandturkiyestateoftheartreviewandcapabilitymaturitymodelling AT mehmetkoraypekericli advancingaipoweredbimforcircularityinconstructionintheukandturkiyestateoftheartreviewandcapabilitymaturitymodelling AT sharifulshikder advancingaipoweredbimforcircularityinconstructionintheukandturkiyestateoftheartreviewandcapabilitymaturitymodelling AT mercyogunnusi advancingaipoweredbimforcircularityinconstructionintheukandturkiyestateoftheartreviewandcapabilitymaturitymodelling |