Environmental risk assessment of Kermanshah petrochemical complex using FMEA method

Introduction: Development of various industries, despite providing human welfare, has potential risks for mankind. Due to its extensive operations and activity and also the potential risk for humans and the environment, the petrochemical industry is considered a high-risk industry. The purpose of th...

Full description

Saved in:
Bibliographic Details
Main Authors: Sajjad Bahrami, Ahad Sotoudeh, Naser Jamshidi, Mohammad Reza Elmi
Format: Article
Language:fas
Published: Shahid Beheshti University 2018-09-01
Series:علوم محیطی
Subjects:
Online Access:https://envs.sbu.ac.ir/article_97952_fb21e21eee09c353247018c2c212f724.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850137855656984576
author Sajjad Bahrami
Ahad Sotoudeh
Naser Jamshidi
Mohammad Reza Elmi
author_facet Sajjad Bahrami
Ahad Sotoudeh
Naser Jamshidi
Mohammad Reza Elmi
author_sort Sajjad Bahrami
collection DOAJ
description Introduction: Development of various industries, despite providing human welfare, has potential risks for mankind. Due to its extensive operations and activity and also the potential risk for humans and the environment, the petrochemical industry is considered a high-risk industry. The purpose of this study was to assess and prioritize the risks resulting from process activities in Kermanshah petrochemical complex using two approaches (i.e., the traditional and fuzzy FMEA method). Material and methods: The present study was an analytical-field research that has been conducted in Kermanshah petrochemical complex for 10 months. In this study, the product lines (urea and ammonia) were investigated and also a team of five experts was formed. In addition, an initial list of the most important risks and hazards in the environmental field was prepared and then, by using Brainstorming and Delphi Technique, the list was corrected. Finally, environmental risk assessment in the form of traditional and fuzzy FMEA methods was evaluated.  Results and discussion: According to the results, 38 risks were identified by traditional FMEA. The highest priority risk was related to hydrogen and ammonia gas emissions when the ammonia unit was out of service by RPN number of 491. The lowest priority risk belonged to ammonia effluents by RPN number of 28. Also, the highest risks to air pollution, as well as the causes of the risks were related to defects in the system and connections. The results of input fuzzification and output FMEA method showed that among the 15 identified risks in the petrochemical complex, the highest number of fuzzy priority in the health section was related to noise pollution (0.75), in the safety section was falling from the heights (0.75), and in the environmental sector for the reduction of ecological resources (0.613). Conclusion: Comparing these two approaches suggest that the traditional FMEA is powerful in the early stages of risk assessment process, and on the other hand, the fuzzy approach is more flexible and user-friendly in the stage of prioritizing the risks.
format Article
id doaj-art-7d32dc6f920146509e8865b7a9499b8a
institution OA Journals
issn 1735-1324
2588-6177
language fas
publishDate 2018-09-01
publisher Shahid Beheshti University
record_format Article
series علوم محیطی
spelling doaj-art-7d32dc6f920146509e8865b7a9499b8a2025-08-20T02:30:43ZfasShahid Beheshti Universityعلوم محیطی1735-13242588-61772018-09-0116312497952Environmental risk assessment of Kermanshah petrochemical complex using FMEA methodSajjad Bahrami0Ahad Sotoudeh1Naser Jamshidi2Mohammad Reza Elmi3Department of Environment, Faculty of Natural Resources and Desert Studies, Yazd University, Yazd, IranDepartment of Environment, Faculty of Natural Resources and Desert Studies, Yazd University, Yazd, IranHSE Training Planning and Performance Assessment Manager, National Petrochemical Company, Tehran, IranDepartment of Environment, Faculty of Natural Resources and Desert Studies, Yazd University, Yazd, IranIntroduction: Development of various industries, despite providing human welfare, has potential risks for mankind. Due to its extensive operations and activity and also the potential risk for humans and the environment, the petrochemical industry is considered a high-risk industry. The purpose of this study was to assess and prioritize the risks resulting from process activities in Kermanshah petrochemical complex using two approaches (i.e., the traditional and fuzzy FMEA method). Material and methods: The present study was an analytical-field research that has been conducted in Kermanshah petrochemical complex for 10 months. In this study, the product lines (urea and ammonia) were investigated and also a team of five experts was formed. In addition, an initial list of the most important risks and hazards in the environmental field was prepared and then, by using Brainstorming and Delphi Technique, the list was corrected. Finally, environmental risk assessment in the form of traditional and fuzzy FMEA methods was evaluated.  Results and discussion: According to the results, 38 risks were identified by traditional FMEA. The highest priority risk was related to hydrogen and ammonia gas emissions when the ammonia unit was out of service by RPN number of 491. The lowest priority risk belonged to ammonia effluents by RPN number of 28. Also, the highest risks to air pollution, as well as the causes of the risks were related to defects in the system and connections. The results of input fuzzification and output FMEA method showed that among the 15 identified risks in the petrochemical complex, the highest number of fuzzy priority in the health section was related to noise pollution (0.75), in the safety section was falling from the heights (0.75), and in the environmental sector for the reduction of ecological resources (0.613). Conclusion: Comparing these two approaches suggest that the traditional FMEA is powerful in the early stages of risk assessment process, and on the other hand, the fuzzy approach is more flexible and user-friendly in the stage of prioritizing the risks.https://envs.sbu.ac.ir/article_97952_fb21e21eee09c353247018c2c212f724.pdfrisk assessmentenvironmentfuzzy- fmeakermanshah petrochemical
spellingShingle Sajjad Bahrami
Ahad Sotoudeh
Naser Jamshidi
Mohammad Reza Elmi
Environmental risk assessment of Kermanshah petrochemical complex using FMEA method
علوم محیطی
risk assessment
environment
fuzzy- fmea
kermanshah petrochemical
title Environmental risk assessment of Kermanshah petrochemical complex using FMEA method
title_full Environmental risk assessment of Kermanshah petrochemical complex using FMEA method
title_fullStr Environmental risk assessment of Kermanshah petrochemical complex using FMEA method
title_full_unstemmed Environmental risk assessment of Kermanshah petrochemical complex using FMEA method
title_short Environmental risk assessment of Kermanshah petrochemical complex using FMEA method
title_sort environmental risk assessment of kermanshah petrochemical complex using fmea method
topic risk assessment
environment
fuzzy- fmea
kermanshah petrochemical
url https://envs.sbu.ac.ir/article_97952_fb21e21eee09c353247018c2c212f724.pdf
work_keys_str_mv AT sajjadbahrami environmentalriskassessmentofkermanshahpetrochemicalcomplexusingfmeamethod
AT ahadsotoudeh environmentalriskassessmentofkermanshahpetrochemicalcomplexusingfmeamethod
AT naserjamshidi environmentalriskassessmentofkermanshahpetrochemicalcomplexusingfmeamethod
AT mohammadrezaelmi environmentalriskassessmentofkermanshahpetrochemicalcomplexusingfmeamethod