Berth Allocation and Quay Crane Scheduling in Port Operations: A Systematic Review
Container terminals are facing significant challenges in meeting the increasing demands for volume and throughput, with limited space often presenting as a critical constraint. Key areas of concern at the quayside include the berth allocation problem, the quay crane assignment, and the scheduling pr...
Saved in:
| Main Authors: | Ndifelani Makhado, Thulane Paepae, Matthews Sejeso, Charis Harley |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
MDPI AG
2025-07-01
|
| Series: | Journal of Marine Science and Engineering |
| Subjects: | |
| Online Access: | https://www.mdpi.com/2077-1312/13/7/1339 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Integrated Scheduling of Automated Yard Cranes and Automated Guided Vehicles with Limited Buffer Capacity of Dual-Trolley Quay Cranes in Automated Container Terminals
by: Doaa Naeem, et al.
Published: (2022-12-01) -
Seismic performance of an existing anchored quay wall in the Ravenna port (Italy)
by: Pierluigi Alesiani, et al.
Published: (2025-09-01) -
Wildlife of Florida Factsheets: Florida Sandhill Crane
by: Hannah Fox, et al.
Published: (2022-05-01) -
Mathematical Programming Formulations for the Berth Allocation Problems in Container Seaport Terminals
by: Awad M. Aljuaid, et al.
Published: (2024-05-01) -
INVENTORY OF CRANES AND THEIR MODERN STATE ON THE TERRITORY OF DAGESTAN
by: Ye. V. Vilkov
Published: (2014-11-01)