Discussion on Prevention and Control Method of Rock burst Strata and Shock Resistance of Shield with TBM in Deep Buried High Stress Tunnels
Saved in:
| Main Authors: | LU Yiqiang, HE Fei, WANG Mingyao, XING Yunbo, Liao Jianxing, FENG Huanhuan, MA Tianhui |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Editorial Department of Journal of Sichuan University (Engineering Science Edition)
2025-01-01
|
| Series: | 工程科学与技术 |
| Subjects: | |
| Online Access: | http://jsuese.scu.edu.cn/thesisDetails#10.12454/j.jsuese.202400650 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Application of Long-Distance Drilling and Blasting Technology to Prevent Rock Bursts in High-Level Roofs
by: Qianyue Gu, et al.
Published: (2025-02-01) -
Prediction of Settlement Due to Shield TBM Tunneling Based on Three-Dimensional Numerical Analysis
by: Ji-Seok Yun, et al.
Published: (2025-06-01) -
Unstuck Technology for EPB/TBM Dual Mode Shield Machine Stuck in Rock Stratum
by: DUAN Yueqiang
Published: (2025-01-01) -
The Simulation of Grouting Behavior in the Pea Gravel Filling Layer Behind a Double-Shield TBM Based on the Level Set Method
by: Xinlong Li, et al.
Published: (2025-07-01) -
Rock and machine interaction law during TBM crossing fault and prevention and control technology of jamming disaster in Shoushan No.1 Mine
by: Jianguo ZHANG, et al.
Published: (2025-08-01)