Application of strategic stockpile for ore quality stabilization at Erdenet open pit mine

Ore mixing and blending are performed at the mining benches, typically involving 6-8 working benches. However, as the mine deepens, operations across multiple benches become more challenging, and declining copper grades necessitate increased processing plant capacity. Variability in total copper con...

Full description

Saved in:
Bibliographic Details
Main Authors: Batsukh Elbegzaya, Sodnom Tsedendorj, Battogtokh Batbold, Borya Orkhontuul
Format: Article
Language:English
Published: Mongolian University of Science and Technology 2025-06-01
Series:Mongolian Geoscientist
Subjects:
Online Access:https://www.mongoliajol.info/index.php/MGS/article/view/3747
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1849691272001880064
author Batsukh Elbegzaya
Sodnom Tsedendorj
Battogtokh Batbold
Borya Orkhontuul
author_facet Batsukh Elbegzaya
Sodnom Tsedendorj
Battogtokh Batbold
Borya Orkhontuul
author_sort Batsukh Elbegzaya
collection DOAJ
description Ore mixing and blending are performed at the mining benches, typically involving 6-8 working benches. However, as the mine deepens, operations across multiple benches become more challenging, and declining copper grades necessitate increased processing plant capacity. Variability in total copper content in the sulfide ore can reach up to 8%, with an allowable range of 0.541% to 0.461% when the average is 0.501%, as per internal Erdenet standard STP-01352-901908085-11:2013. Maintaining this standard within a 24-hour period is difficult, complicating process control. To achieve an 85% metal recovery rate, the processing plant is adjusted to meet the standard ore quality. However, short-term fluctuations exceeding ±8% lead to decreased recovery rates and potential metal loss. Establishing tactical stockpiles close to the primary crushers or along transportation routes can mitigate these issues by stabilizing ore quality before processing. The tactical stockpile project relies on optimizing operational procedures, integrating stockpile construction using mine-sourced waste rock, preparing platforms, utilizing existing equipment capacity, enhancing signage and lighting, and creating guidelines for safe operation and grade averaging. This approach provides a rapid and effective solution to improve blending efficiency and operational stability.
format Article
id doaj-art-7b941bdaa2b6483c8e944436ad5520a8
institution DOAJ
issn 2220-0622
2663-5151
language English
publishDate 2025-06-01
publisher Mongolian University of Science and Technology
record_format Article
series Mongolian Geoscientist
spelling doaj-art-7b941bdaa2b6483c8e944436ad5520a82025-08-20T03:21:06ZengMongolian University of Science and TechnologyMongolian Geoscientist2220-06222663-51512025-06-013060465410.5564/mgs.v30i60.37473698Application of strategic stockpile for ore quality stabilization at Erdenet open pit mineBatsukh Elbegzaya0https://orcid.org/0009-0008-4132-2651Sodnom Tsedendorj1Battogtokh Batbold2https://orcid.org/0000-0002-1601-340XBorya Orkhontuul3https://orcid.org/0009-0006-3023-3309Department of Mining Technology, School of Geology and Mining, Mongolian University of Science and Technology, Ulaanbaatar 14200, MongoliaDepartment of Mining Technology, School of Geology and Mining, Mongolian University of Science and Technology, Ulaanbaatar 14200, MongoliaErdenet Mining Corporation, Erdenet city 61000, MongoliaDepartment of Mineral Processing and Engineering, School of Geology and Mining, Mongolian University of Science and Technology, Ulaanbaatar 14200, MongoliaOre mixing and blending are performed at the mining benches, typically involving 6-8 working benches. However, as the mine deepens, operations across multiple benches become more challenging, and declining copper grades necessitate increased processing plant capacity. Variability in total copper content in the sulfide ore can reach up to 8%, with an allowable range of 0.541% to 0.461% when the average is 0.501%, as per internal Erdenet standard STP-01352-901908085-11:2013. Maintaining this standard within a 24-hour period is difficult, complicating process control. To achieve an 85% metal recovery rate, the processing plant is adjusted to meet the standard ore quality. However, short-term fluctuations exceeding ±8% lead to decreased recovery rates and potential metal loss. Establishing tactical stockpiles close to the primary crushers or along transportation routes can mitigate these issues by stabilizing ore quality before processing. The tactical stockpile project relies on optimizing operational procedures, integrating stockpile construction using mine-sourced waste rock, preparing platforms, utilizing existing equipment capacity, enhancing signage and lighting, and creating guidelines for safe operation and grade averaging. This approach provides a rapid and effective solution to improve blending efficiency and operational stability.https://www.mongoliajol.info/index.php/MGS/article/view/3747accumulation and bedding stockyardsoperational dataore controlfleet management system
spellingShingle Batsukh Elbegzaya
Sodnom Tsedendorj
Battogtokh Batbold
Borya Orkhontuul
Application of strategic stockpile for ore quality stabilization at Erdenet open pit mine
Mongolian Geoscientist
accumulation and bedding stockyards
operational data
ore control
fleet management system
title Application of strategic stockpile for ore quality stabilization at Erdenet open pit mine
title_full Application of strategic stockpile for ore quality stabilization at Erdenet open pit mine
title_fullStr Application of strategic stockpile for ore quality stabilization at Erdenet open pit mine
title_full_unstemmed Application of strategic stockpile for ore quality stabilization at Erdenet open pit mine
title_short Application of strategic stockpile for ore quality stabilization at Erdenet open pit mine
title_sort application of strategic stockpile for ore quality stabilization at erdenet open pit mine
topic accumulation and bedding stockyards
operational data
ore control
fleet management system
url https://www.mongoliajol.info/index.php/MGS/article/view/3747
work_keys_str_mv AT batsukhelbegzaya applicationofstrategicstockpilefororequalitystabilizationaterdenetopenpitmine
AT sodnomtsedendorj applicationofstrategicstockpilefororequalitystabilizationaterdenetopenpitmine
AT battogtokhbatbold applicationofstrategicstockpilefororequalitystabilizationaterdenetopenpitmine
AT boryaorkhontuul applicationofstrategicstockpilefororequalitystabilizationaterdenetopenpitmine