Impact Analysis of BIM on Power Substation Project Costs: Techno-Economic Data Evidence from China
Due to the difficulty in measuring intangible effects and the reliance on experts for benefit evaluation, actual project data evidence of the impact of BIM is insufficient. To this end, this study collected total project cost data from 164 power substation projects and techno-economic statements fro...
Saved in:
| Main Authors: | Ding Liu, Lizhong Qi, Yi Sun, Jingguo Rong, Su Zhang, Guangze Yu |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
MDPI AG
2025-05-01
|
| Series: | Buildings |
| Subjects: | |
| Online Access: | https://www.mdpi.com/2075-5309/15/11/1885 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The impact of BIM on project time and cost: insights from case studies
by: Karan Das, et al.
Published: (2025-02-01) -
CHARACTERISING BIM-BASED CONSTRUCTION PROJECTS: A STRATEGIC AND CONTINGENT BIM APPLICATION MODEL
by: Oluseye Olugboyega, et al.
Published: (2019-09-01) -
Economical Regulating Strategies Based on Enhanced EVM Model in Electric Substation Construction Projects
by: Hongyan Xin, et al.
Published: (2025-07-01) -
Prioritizing BIM applications and advantages in construction project management
by: Farzad Fani, et al.
Published: (2019-05-01) -
Identifying and Evaluating Effective Criteria on BIM Projects Using the DANP Technique
by: Atefeh Hemmati, et al.
Published: (2026-01-01)