Nuclear Power Plant Construction Scheduling Problem with Time Restrictions: A Particle Swarm Optimization Approach
In nuclear power plant construction scheduling, a project is generally defined by its dependent preparation time, the time required for construction, and its reactor installation time. The issues of multiple construction teams and multiple reactor installation teams are considered. In this paper, a...
Saved in:
| Main Authors: | Shang-Kuan Chen, Yen-Wu Ti, Kuo-Yu Tsai |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2016-01-01
|
| Series: | Science and Technology of Nuclear Installations |
| Online Access: | http://dx.doi.org/10.1155/2016/2150692 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Hybrid Particle Swarm and Differential Evolution Algorithm for Solving Multimode Resource-Constrained Project Scheduling Problem
by: Lieping Zhang, et al.
Published: (2015-01-01) -
Integrated Cost and Schedule Control Systems for Nuclear Power Plant Construction: Leveraging Strategic Advantages to Owners and EPC Firms
by: Youngsoo Jung, et al.
Published: (2015-01-01) -
Multiple R&D Projects Scheduling Optimization with Improved Particle Swarm Algorithm
by: Mengqi Liu, et al.
Published: (2014-01-01) -
Multidimensional Resource Task Scheduling Based on Particle Swarm Optimization in Edge Computing
by: Zhonglu Zou, et al.
Published: (2025-01-01) -
Sleep scheduling-aware minimum power broadcast in wireless ad hoc networks based on discrete particle swarm optimization
by: Xiao-jian ZHU, et al.
Published: (2013-06-01)