Geomechanical justification of rock mass stability during underground limestone mining in quarry walls

The results of numerical simulation of the behavior of the quarry side during limestone excavation in the software package PLAXIS 3D are presented. It is noted that with the help of numerical modeling methods it is possible to perform geomechanical assessment of the stability of the quarry sides...

Full description

Saved in:
Bibliographic Details
Main Authors: A.O. Ostapchuk, O.O. Frolov
Format: Article
Language:English
Published: Zhytomyr Polytechnic State University 2025-07-01
Series:Технічна інженерія
Subjects:
Online Access:https://ten.ztu.edu.ua/article/view/334246
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1849708978249924608
author A.O. Ostapchuk
O.O. Frolov
author_facet A.O. Ostapchuk
O.O. Frolov
author_sort A.O. Ostapchuk
collection DOAJ
description The results of numerical simulation of the behavior of the quarry side during limestone excavation in the software package PLAXIS 3D are presented. It is noted that with the help of numerical modeling methods it is possible to perform geomechanical assessment of the stability of the quarry sides taking into account their geometry, physical and mechanical properties of the rock mass and technological parameters of the development system. Analysis of methods for assessing the stress-strain state of the rock mass at the development of mineral deposits and methods for predicting the stability of the sides of the quarry showed that the most appropriate method of numerical modeling is the method of individual (discrete) elements, which, among other things, is implemented in PLAXIS 3D using the Coulomb-Mohr strength criterion. The possibility of excavation of limestone of Humenetskyi deposit in the sides of the quarry auger mining system, which provides high stability of the passed mine workings and stability of the rock mass has been established. Numerical modeling of the behavior of the rock mass during and after the excavation of limestone in the side of the quarry complex with auger executive body with a diameter of 2,0 m to a depth of 40 m showed that, at distances between the workings from 2,5 to 0,5 m, the numerical values of vertical surface precipitation are insignificant and vary from 0,0295 to 0,0544 mm, respectively, that is, exceeding the critically acceptable value of surface precipitation of 15 mm has not been recorded. According to the results of numerical modeling, the graphical dependence of the change in the values of vertical surface precipitation of the rock mass from the distance between the workings in the side of the quarry is constructed and the corresponding analytical dependence is established.
format Article
id doaj-art-792e28ec80b246caa910c0cf8485413a
institution DOAJ
issn 2706-5847
2707-9619
language English
publishDate 2025-07-01
publisher Zhytomyr Polytechnic State University
record_format Article
series Технічна інженерія
spelling doaj-art-792e28ec80b246caa910c0cf8485413a2025-08-20T03:15:28ZengZhytomyr Polytechnic State UniversityТехнічна інженерія2706-58472707-96192025-07-01951179186doi.org/10.26642/ten-2025-1(95)-179-186Geomechanical justification of rock mass stability during underground limestone mining in quarry wallsA.O. Ostapchuk0https://orcid.org/0009-0001-5766-3863O.O. Frolov1https://orcid.org/0000-0001-8053-2653National Technical University of Ukraine "Kyiv Polytechnic Institute named after I.Sikorsky" , UkraineNational Technical University of Ukraine "Kyiv Polytechnic Institute named after I.Sikorsky" , UkraineThe results of numerical simulation of the behavior of the quarry side during limestone excavation in the software package PLAXIS 3D are presented. It is noted that with the help of numerical modeling methods it is possible to perform geomechanical assessment of the stability of the quarry sides taking into account their geometry, physical and mechanical properties of the rock mass and technological parameters of the development system. Analysis of methods for assessing the stress-strain state of the rock mass at the development of mineral deposits and methods for predicting the stability of the sides of the quarry showed that the most appropriate method of numerical modeling is the method of individual (discrete) elements, which, among other things, is implemented in PLAXIS 3D using the Coulomb-Mohr strength criterion. The possibility of excavation of limestone of Humenetskyi deposit in the sides of the quarry auger mining system, which provides high stability of the passed mine workings and stability of the rock mass has been established. Numerical modeling of the behavior of the rock mass during and after the excavation of limestone in the side of the quarry complex with auger executive body with a diameter of 2,0 m to a depth of 40 m showed that, at distances between the workings from 2,5 to 0,5 m, the numerical values of vertical surface precipitation are insignificant and vary from 0,0295 to 0,0544 mm, respectively, that is, exceeding the critically acceptable value of surface precipitation of 15 mm has not been recorded. According to the results of numerical modeling, the graphical dependence of the change in the values of vertical surface precipitation of the rock mass from the distance between the workings in the side of the quarry is constructed and the corresponding analytical dependence is established.https://ten.ztu.edu.ua/article/view/334246mineral reservesnon-precrystallized limestonequarrysidewallmodelingauger mining complexsurface settlementmining excavation
spellingShingle A.O. Ostapchuk
O.O. Frolov
Geomechanical justification of rock mass stability during underground limestone mining in quarry walls
Технічна інженерія
mineral reserves
non-precrystallized limestone
quarry
sidewall
modeling
auger mining complex
surface settlement
mining excavation
title Geomechanical justification of rock mass stability during underground limestone mining in quarry walls
title_full Geomechanical justification of rock mass stability during underground limestone mining in quarry walls
title_fullStr Geomechanical justification of rock mass stability during underground limestone mining in quarry walls
title_full_unstemmed Geomechanical justification of rock mass stability during underground limestone mining in quarry walls
title_short Geomechanical justification of rock mass stability during underground limestone mining in quarry walls
title_sort geomechanical justification of rock mass stability during underground limestone mining in quarry walls
topic mineral reserves
non-precrystallized limestone
quarry
sidewall
modeling
auger mining complex
surface settlement
mining excavation
url https://ten.ztu.edu.ua/article/view/334246
work_keys_str_mv AT aoostapchuk geomechanicaljustificationofrockmassstabilityduringundergroundlimestonemininginquarrywalls
AT oofrolov geomechanicaljustificationofrockmassstabilityduringundergroundlimestonemininginquarrywalls