A Fuzzy Rule for Improving the Performance of Multiobjective Job Dispatching in a Wafer Fabrication Factory
This paper proposes a fuzzy slack-diversifying fluctuation-smoothing rule to enhance the scheduling performance in a wafer fabrication factory. The proposed rule considers the uncertainty in the remaining cycle time and is aimed at simultaneous improvement of the average cycle time, cycle time stand...
Saved in:
Main Authors: | Toly Chen, Yi-Chi Wang |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2013-01-01
|
Series: | Journal of Applied Mathematics |
Online Access: | http://dx.doi.org/10.1155/2013/986172 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A Fuzzy Nonlinear Programming Approach for Optimizing the Performance of a Four-Objective Fluctuation Smoothing Rule in a Wafer Fabrication Factory
by: Horng-Ren Tsai, et al.
Published: (2013-01-01) -
Fuzzy TOPSIS for Multiresponse Quality Problems in Wafer Fabrication Processes
by: Chiun-Ming Liu, et al.
Published: (2013-01-01) -
A Selection Hyper-Heuristic Algorithm for Multiobjective Dynamic Economic and Environmental Load Dispatch
by: Le Yang, et al.
Published: (2020-01-01) -
The Importance of Cognitive and Mental Factors on Prediction of Job Performance in Chinese High-Speed Railway Dispatchers
by: Zizheng Guo, et al.
Published: (2020-01-01) -
Hierarchical Multiobjective Dispatching Strategy for the Microgrid System Using Modified MOEA/D
by: Xiaofeng Wan, et al.
Published: (2020-01-01)