Double Girder Bridge Crane with Double Cycling: Scheduling Strategy and Performance Evaluation
This paper introduces a novel quay crane design, double girder bridge crane (DGBC). DGBC is capable of handling containers of two adjacent bays simultaneously, avoiding crane collisions, saving travelling and reposition cost, and eventually improving terminal efficiency. This problem is formulated a...
Saved in:
| Main Authors: | Dandan Wang, Anne Goodchild, Xiaoping Li, Zun Wang |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2014-01-01
|
| Series: | Journal of Applied Mathematics |
| Online Access: | http://dx.doi.org/10.1155/2014/418689 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
STUDY ON PROBABILISTIC SAFETY ASSESSMENT FOR BOX GIRDER OF BRIDGE AND GANTRY CRANE
by: LUO YouHong, et al.
Published: (2017-01-01) -
RESEARCH ON SAFETY ASSESSMENT METHOD FOR BOX GIRDER OF BRIDGE AND GANTRY CRANE
by: XIONG Gang, et al.
Published: (2016-01-01) -
A Hybrid Meta-Heuristic Approach for Solving Single-Vessel Quay Crane Scheduling with Double-Cycling
by: Fahrettin Eldemir, et al.
Published: (2025-02-01) -
STRESS-DEFORMED STATE OF A STRUT-FRAMED CRANE GIRDER
by: Kh. M. Muselemov, et al.
Published: (2017-10-01) -
Dynamic Characteristics of a Double-Pylon Cable-Stayed Bridge with Steel Truss Girder and Single-Cable Plane
by: Yong Zeng, et al.
Published: (2021-01-01)