Research on Constraint Processing Method of High-dimensional Optimization Operation Problem of Cascade Reservoirs
With the expansion of operational scales and the refinement of time steps in optimizing cascade reservoirs, the dimensionality of decision variables in such problems can range from hundreds to thousands. In the operational optimization of cascaded reservoirs with high-dimensional decision variables,...
Saved in:
| Main Authors: | Zhongzheng HE, Shuliang LI, Wei HUANG, Feng YAN, Jisi FU, bin XIONG |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Editorial Department of Journal of Sichuan University (Engineering Science Edition)
2024-11-01
|
| Series: | 工程科学与技术 |
| Subjects: | |
| Online Access: | http://jsuese.scu.edu.cn/thesisDetails#10.15961/j.jsuese.202300119 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Analysis of Reservoir Regulation Capacity Based on Cascade POA Optimal Scheduling Model
by: HOU Jiaqi, et al.
Published: (2021-01-01) -
Spatiotemporally Combined Dimensionality Reduction Algorithm for Optimizing Long-term Operation of Multi-reservoir Systems
by: CHEN Jia, et al.
Published: (2023-01-01) -
Optimal Coordinated Flood Control Scheduling of Three Gorges and Qingjiang Cascade Reservoirs
by: ZHAO Hui, ZHU Yu-xin, LIU Yuan, HUANG Bin, PANG Shu-sen, HUANG Di
Published: (2025-08-01) -
Risk Analysis of Sequential Dam Break of Cascade Reservoirs and Simulation of Flood Routing
by: YU Zibo, et al.
Published: (2021-01-01) -
Assessment of the Water Quality of Jatiluhur Reservoir, the Downstream of Citarum Cascade River, Using Selected Physico-Chemical Parameters
by: Lieza Corsita, et al.
Published: (2014-06-01)