Soil Improvement of EPBS Construction in High Water Pressure and High Permeability Sand Stratum
A mud-water balance shield is the preferred method for the high permeability and high water pressure stratum, but when restricted by construction and environmental conditions, the shield must be constructed with the earth pressure balance shield (EPBS). The risk of slag spraying is extremely high du...
Saved in:
| Main Authors: | Shimin Wang, Xixi Lu, Xianming Wang, Chuan He, Xin Xia, Lei Ruan, Yunqi Jian |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2019-01-01
|
| Series: | Advances in Civil Engineering |
| Online Access: | http://dx.doi.org/10.1155/2019/4503219 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Unstuck Technology for EPB/TBM Dual Mode Shield Machine Stuck in Rock Stratum
by: DUAN Yueqiang
Published: (2025-01-01) -
Experimental Study on the Soil Conditioning Materials for EPB Shield Tunneling in Silty Sand
by: Chi-Hao Cheng, et al.
Published: (2020-01-01) -
Risk Assessment Study on Mechanical Connecting Aisle Construction in the Bohai Mudstone Stratum with High Water Pressure
by: Wencui Zhang, et al.
Published: (2022-01-01) -
Comprehensive Construction Method for Shield Receiving in Water-rich Silty Sand Stratum
by: CHEN Yubing, et al.
Published: (2024-12-01) -
Pore Water Pressure Responses in Sand Stratum during Shield Tunnelling: A Case Study
by: Yu Liang, et al.
Published: (2020-01-01)