Chemical Grouting Trial Engineering Operation in Lower Reservoir Dam of Huizhou Pumped Storage Power Station and Result Analysis
Saved in:
Main Authors: | XU Xiu-mei, SHI Song-ling |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2011-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47658016&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Introduction of Roller Compacted Concrete Dam Engineering Measures in Huizhou Pumped Storage Power Station
by: LEI Zhen
Published: (2009-01-01) -
Hydraulic Modelling of Inlet/Outlet of Lower Reservoir for Huizhou Pump Storage Plant
by: 张从联, et al.
Published: (2003-01-01) -
Selection of the Type of the Major Dam for the Upper Reservoir in the Shenzhen Pumped Storage Station
by: FENG Qing-qun, et al.
Published: (2006-01-01) -
Choice of Operating Normal Head for Pump Turbines of Huizhou Pumped Storage Plant
by: 何文才
Published: (2004-01-01) -
Treatment of Cracks in Dam Toe with Chemical Grouting for Gudongkou Hydropower Station
by: 杨学红, et al.
Published: (2002-01-01)