ASSESSING THE IMPACT OF DELAYS ON THE PRODUCTIVITY OF CONCRETE PLACEMENT BY CRANES IN NIGERIA

Infrastructural construction investment in Nigeria is currently estimated at US$5bn annually and of the key trades in the industry, concreting makes up about 15% of the total frequency of operations. One of the most dominant concrete-placement methods in Nigeria is by crane and skip and it has been...

Full description

Saved in:
Bibliographic Details
Main Authors: Olaoluwa Olatunde, Ojo Stephen Okunola, Adesanya David Abiodun
Format: Article
Language:English
Published: UJ Press 2011-12-01
Series:Journal of Construction Project Management and Innovation
Subjects:
Online Access:https://journals.uj.ac.za/index.php/JCPMI/article/view/16
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1841555094022127616
author Olaoluwa Olatunde
Ojo Stephen Okunola
Adesanya David Abiodun
author_facet Olaoluwa Olatunde
Ojo Stephen Okunola
Adesanya David Abiodun
author_sort Olaoluwa Olatunde
collection DOAJ
description Infrastructural construction investment in Nigeria is currently estimated at US$5bn annually and of the key trades in the industry, concreting makes up about 15% of the total frequency of operations. One of the most dominant concrete-placement methods in Nigeria is by crane and skip and it has been established that fractional delay (delay time expressed as a fraction of pour duration) is the most significant factor affecting its productivity. This study therefore focused on evaluating the extent of delays on craned concrete placement in Nigeria and determining their effects on concreting productivity. The study involved a close observation of 35 daily concrete pours placed by crane and skip on 25 project sites selected through stratified random sampling procedure in Lagos. Productivity data obtained were analysed by multiple regression to obtain a model relating productivity to fractional delay. The results showed an average delay of above 23% of the pour time while the productivity is reduced by more than 2.5 m3/h for every 10% increase in delay. The latter is over 5 times the productivity reduction obtained in Hong Kong study for the same percentage increase in delay and confirms that delay has a far greater impact on the productivity of concrete placement by cranes in Nigeria than in other countries. It was recommended that serious, and concerted, managerial actions be directed at proper planning and scheduling of material deliveries as well as labour and equipment inputs by adopting the developed model to monitor and eliminate most delays and sustain productivity.
format Article
id doaj-art-73db1bb4c8d04a559a41151e32942e5b
institution Kabale University
issn 2223-7852
2959-9652
language English
publishDate 2011-12-01
publisher UJ Press
record_format Article
series Journal of Construction Project Management and Innovation
spelling doaj-art-73db1bb4c8d04a559a41151e32942e5b2025-01-08T06:15:46ZengUJ PressJournal of Construction Project Management and Innovation2223-78522959-96522011-12-011210.36615/jcpmi.v1i2.16ASSESSING THE IMPACT OF DELAYS ON THE PRODUCTIVITY OF CONCRETE PLACEMENT BY CRANES IN NIGERIAOlaoluwa Olatunde0Ojo Stephen Okunola1Adesanya David Abiodun2Department of Building, Obafemi Awolowo University, Ile-Ife, NigeriaDepartment of Building, Obafemi Awolowo University, Ile-Ife, NigeriaDepartment of Building, Obafemi Awolowo University, Ile-Ife, Nigeria Infrastructural construction investment in Nigeria is currently estimated at US$5bn annually and of the key trades in the industry, concreting makes up about 15% of the total frequency of operations. One of the most dominant concrete-placement methods in Nigeria is by crane and skip and it has been established that fractional delay (delay time expressed as a fraction of pour duration) is the most significant factor affecting its productivity. This study therefore focused on evaluating the extent of delays on craned concrete placement in Nigeria and determining their effects on concreting productivity. The study involved a close observation of 35 daily concrete pours placed by crane and skip on 25 project sites selected through stratified random sampling procedure in Lagos. Productivity data obtained were analysed by multiple regression to obtain a model relating productivity to fractional delay. The results showed an average delay of above 23% of the pour time while the productivity is reduced by more than 2.5 m3/h for every 10% increase in delay. The latter is over 5 times the productivity reduction obtained in Hong Kong study for the same percentage increase in delay and confirms that delay has a far greater impact on the productivity of concrete placement by cranes in Nigeria than in other countries. It was recommended that serious, and concerted, managerial actions be directed at proper planning and scheduling of material deliveries as well as labour and equipment inputs by adopting the developed model to monitor and eliminate most delays and sustain productivity. https://journals.uj.ac.za/index.php/JCPMI/article/view/16concrete placement, crane, delays, impact, Nigeria, productivity
spellingShingle Olaoluwa Olatunde
Ojo Stephen Okunola
Adesanya David Abiodun
ASSESSING THE IMPACT OF DELAYS ON THE PRODUCTIVITY OF CONCRETE PLACEMENT BY CRANES IN NIGERIA
Journal of Construction Project Management and Innovation
concrete placement, crane, delays, impact, Nigeria, productivity
title ASSESSING THE IMPACT OF DELAYS ON THE PRODUCTIVITY OF CONCRETE PLACEMENT BY CRANES IN NIGERIA
title_full ASSESSING THE IMPACT OF DELAYS ON THE PRODUCTIVITY OF CONCRETE PLACEMENT BY CRANES IN NIGERIA
title_fullStr ASSESSING THE IMPACT OF DELAYS ON THE PRODUCTIVITY OF CONCRETE PLACEMENT BY CRANES IN NIGERIA
title_full_unstemmed ASSESSING THE IMPACT OF DELAYS ON THE PRODUCTIVITY OF CONCRETE PLACEMENT BY CRANES IN NIGERIA
title_short ASSESSING THE IMPACT OF DELAYS ON THE PRODUCTIVITY OF CONCRETE PLACEMENT BY CRANES IN NIGERIA
title_sort assessing the impact of delays on the productivity of concrete placement by cranes in nigeria
topic concrete placement, crane, delays, impact, Nigeria, productivity
url https://journals.uj.ac.za/index.php/JCPMI/article/view/16
work_keys_str_mv AT olaoluwaolatunde assessingtheimpactofdelaysontheproductivityofconcreteplacementbycranesinnigeria
AT ojostephenokunola assessingtheimpactofdelaysontheproductivityofconcreteplacementbycranesinnigeria
AT adesanyadavidabiodun assessingtheimpactofdelaysontheproductivityofconcreteplacementbycranesinnigeria