Stress control method for concrete pouring construction of continuous CFST tied arch bridge: Calculation method and actual bridge case
When the concrete in the tubes of a continuous concrete-filled steel tube (CFST) tied-arch bridge is being grouted, if the grouting sequence is not reasonable, problems such as excessive tensile stress of the bridge piers and repeated tensioning of the tie rods will occur, which seriously affects th...
Saved in:
| Main Authors: | Zengwu Liu, Jianting Zhou, Jingzhou Xin, Wenming Su, Yanchen Teng |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Elsevier
2025-12-01
|
| Series: | Case Studies in Construction Materials |
| Subjects: | |
| Online Access: | http://www.sciencedirect.com/science/article/pii/S2214509525008721 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
RC deck - stiffened arch existing bridges: simulated design and structural analysis
by: Giovanni Crisci, et al.
Published: (2022-03-01) -
Long-term deformation behavior and hanger force adjustment scheme of a prestressed concrete continuous rigid-frame arch bridge
by: Wenshan Gao, et al.
Published: (2025-09-01) -
Closure technology of large span steel truss arch bridge with temporarily fixed edge supports
by: Wang Laifa, et al.
Published: (2025-04-01) -
Seismic Damage Pattern Analysis of Long-Span CFST Arch Bridges Based on Damper Configuration Strategies
by: Bin Zhao, et al.
Published: (2025-08-01) -
Constrained Optimization for the Buckle and Anchor Cable Forces Under One-Time Tension in Long Span Arch Bridge Construction
by: Xiaoyu Zhang, et al.
Published: (2025-05-01)