REDUCTION OF WELL STIMULATION PERIOD AFTER HYDRAULIC FRACTURING

Introduction: The problems arising from backflow of proppant, rock particles and non-decom-posed liquid from hydraulic fractures are considered in the paper. The urgency of the research is caused by the necessity of improvement of well stimulation technology after hydrofracturing. The objective of t...

Full description

Saved in:
Bibliographic Details
Main Author: Alexander Evgenievich Verisokin
Format: Article
Language:Russian
Published: North-Caucasus Federal University 2022-09-01
Series:Наука. Инновации. Технологии
Subjects:
Online Access:https://scienceit.elpub.ru/jour/article/view/184
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850064699374174208
author Alexander Evgenievich Verisokin
author_facet Alexander Evgenievich Verisokin
author_sort Alexander Evgenievich Verisokin
collection DOAJ
description Introduction: The problems arising from backflow of proppant, rock particles and non-decom-posed liquid from hydraulic fractures are considered in the paper. The urgency of the research is caused by the necessity of improvement of well stimulation technology after hydrofracturing. The objective of the paper consists in the development of a set of devices for flushing perforation channels and wellbore walls in the perforation interval after hydrofracturing of a formation. Investigation tools and methods: When writing the paper, the methods of comparison and analysis of national and foreign references in petroleum engineering, patents related to application of formation hydrofracturing were used. Results and discussion: The urgency of developing a device for lushing out of perforated intervals is revealed and substantiated. It is shown that solidified viscoelastic particles of gel enter perforation tunnels and stick to their walls and to the wall of a well. Later these zones of gel particles deposits decrease permeability in perforation tunnels. On the basis of the investigations, the author developed a device for well bottomhole clea-nout that reduces stimulation period for the wells with the above described problems arising after hydrofracturing. To increase productivity of such wells it is necessary to lush out them applying the developed device in the mode of the closest approach to the deposition zones. For better particles lifting to the surface, it is proposed to use foam systems produced by a jet pump which is described in the paper. Conclusion. The set of devices for flushing perforation channels and wellbore walls in the perforation interval which allow for multiple decrease of well stimulation period after hydrofracturing is developed. The described devices are protected by the patents of the Russian Federation: patent for invention No 2651869 "A device for clea-nout", application for patent No 2017109500; patent for invention No 2643882 "Jet pump", application for patent No 2017114222.
format Article
id doaj-art-71ce65f799d14533a7c87ce6d05b5ac8
institution DOAJ
issn 2308-4758
language Russian
publishDate 2022-09-01
publisher North-Caucasus Federal University
record_format Article
series Наука. Инновации. Технологии
spelling doaj-art-71ce65f799d14533a7c87ce6d05b5ac82025-08-20T02:49:13ZrusNorth-Caucasus Federal UniversityНаука. Инновации. Технологии2308-47582022-09-010399114183REDUCTION OF WELL STIMULATION PERIOD AFTER HYDRAULIC FRACTURINGAlexander Evgenievich Verisokin0North-Caucasus Federal UniversityIntroduction: The problems arising from backflow of proppant, rock particles and non-decom-posed liquid from hydraulic fractures are considered in the paper. The urgency of the research is caused by the necessity of improvement of well stimulation technology after hydrofracturing. The objective of the paper consists in the development of a set of devices for flushing perforation channels and wellbore walls in the perforation interval after hydrofracturing of a formation. Investigation tools and methods: When writing the paper, the methods of comparison and analysis of national and foreign references in petroleum engineering, patents related to application of formation hydrofracturing were used. Results and discussion: The urgency of developing a device for lushing out of perforated intervals is revealed and substantiated. It is shown that solidified viscoelastic particles of gel enter perforation tunnels and stick to their walls and to the wall of a well. Later these zones of gel particles deposits decrease permeability in perforation tunnels. On the basis of the investigations, the author developed a device for well bottomhole clea-nout that reduces stimulation period for the wells with the above described problems arising after hydrofracturing. To increase productivity of such wells it is necessary to lush out them applying the developed device in the mode of the closest approach to the deposition zones. For better particles lifting to the surface, it is proposed to use foam systems produced by a jet pump which is described in the paper. Conclusion. The set of devices for flushing perforation channels and wellbore walls in the perforation interval which allow for multiple decrease of well stimulation period after hydrofracturing is developed. The described devices are protected by the patents of the Russian Federation: patent for invention No 2651869 "A device for clea-nout", application for patent No 2017109500; patent for invention No 2643882 "Jet pump", application for patent No 2017114222.https://scienceit.elpub.ru/jour/article/view/184гидроразрыв пластаскважинаперфоканалпроппантустройство для декольматацииполимерпенаструйный насосhydraulic fracturingwellperforation tunnelproppantdevice for cleanoutpolymerfoamjet pump
spellingShingle Alexander Evgenievich Verisokin
REDUCTION OF WELL STIMULATION PERIOD AFTER HYDRAULIC FRACTURING
Наука. Инновации. Технологии
гидроразрыв пласта
скважина
перфоканал
проппант
устройство для декольматации
полимер
пена
струйный насос
hydraulic fracturing
well
perforation tunnel
proppant
device for cleanout
polymer
foam
jet pump
title REDUCTION OF WELL STIMULATION PERIOD AFTER HYDRAULIC FRACTURING
title_full REDUCTION OF WELL STIMULATION PERIOD AFTER HYDRAULIC FRACTURING
title_fullStr REDUCTION OF WELL STIMULATION PERIOD AFTER HYDRAULIC FRACTURING
title_full_unstemmed REDUCTION OF WELL STIMULATION PERIOD AFTER HYDRAULIC FRACTURING
title_short REDUCTION OF WELL STIMULATION PERIOD AFTER HYDRAULIC FRACTURING
title_sort reduction of well stimulation period after hydraulic fracturing
topic гидроразрыв пласта
скважина
перфоканал
проппант
устройство для декольматации
полимер
пена
струйный насос
hydraulic fracturing
well
perforation tunnel
proppant
device for cleanout
polymer
foam
jet pump
url https://scienceit.elpub.ru/jour/article/view/184
work_keys_str_mv AT alexanderevgenievichverisokin reductionofwellstimulationperiodafterhydraulicfracturing