Optimization of Temperature-Control Measures for Concrete Structures: A Case Study of the Sluice Project
Temperature control and crack prevention in sluice pier concrete is a key issue in the early design and construction period. Strong surface insulation may lead to cracks after formwork removal, while weak surface insulation may result in a high crack risk in the early age. The water-cooling measure...
Saved in:
Main Author: | Yaoying Huang |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2018-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2018/4823130 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Temporary Navigation through Release Sluice of Feilaixia Project and Safety Measures
by: 刘平
Published: (2002-01-01) -
Experience in Project Management of Lubao Sluice
by: PAN Jin-jiang, et al.
Published: (2001-01-01) -
Treatment of Foundation for Culverts and Sluices in Dongfeng Hanjiang River Water Transfer Project
by: WU Hai-hong
Published: (2009-01-01) -
Safety Appraisal of Lubao Sluice
by: 潘锦江
Published: (2003-01-01) -
Analysis of Causes of Side Seepage of Plain Sluice
by: ZHOU Xin, et al.
Published: (2023-01-01)