Research on Reactive Power Compensation Device in UHV AC Substation Connected Directly to 500 kV Busbar

Site selection is often difficult for the 1 000 kV UHV AC substation due to its many-grouped reactive power on the low-voltage side of main transformer and the large space occupation. A solution to this problem is proposed in the paper to directly connect the reactive power compensators to the 500 k...

Full description

Saved in:
Bibliographic Details
Main Authors: Lan GUAN, Fei LIU, Weibing WEN, Peng KANG, Junhui HU, Juan ZHAO
Format: Article
Language:zho
Published: State Grid Energy Research Institute 2019-08-01
Series:Zhongguo dianli
Subjects:
Online Access:https://www.electricpower.com.cn/CN/10.11930/j.issn.1004-9649.201903051
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Site selection is often difficult for the 1 000 kV UHV AC substation due to its many-grouped reactive power on the low-voltage side of main transformer and the large space occupation. A solution to this problem is proposed in the paper to directly connect the reactive power compensators to the 500 kV busbar. Based on a comparative analysis of various wiring modes of reactive power compensation devices connected directly to 500 kV busbar and an investigation of the device supply ability, different layout schemes for the connection are studied and compared in terms of life cycle. The results show that the solution can not only improve the capacity of the capacitor and reactor, and reduce the floor space of the reactive power compensation equipment, but also save the energy.
ISSN:1004-9649