Method for Deriation of Intermediate Design Flood of Ningyuan River
Saved in:
Main Authors: | 王东升, 周庆欣 |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2004-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47668966&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Study on Computerization of Forecasting Scheme of Pearl River's Empirical Floods
by: 王东升
Published: (2003-01-01) -
Analysis on Flood Water Discharge Situation in Pearl River Sea-Going Outlets
by: 沈汉堃, et al.
Published: (2006-01-01) -
Analysis of Gamasyab River Flood by Multi-Regression Method
by: Nabe Khazaei, et al.
Published: (2013-08-01) -
Analysis of How Xijiang River Flood Water Influenced the Flood Control Dispatch in Beijiang River
by: GAO Xue-Shan, et al.
Published: (2006-01-01) -
Experience of Mississippi River Flood Control
by: YAN Li, et al.
Published: (2009-01-01)