Analysis of the Earned Value Management and Earned Schedule Techniques in Complex Hydroelectric Power Production Projects: Cost and Time Forecast
All projects take place within a context of uncertainty. That is especially noticeable in complex hydroelectric power generation projects, which are affected by factors such as the large number of multidisciplinary tasks to be performed in parallel, long execution times, or the risks inherent in var...
Saved in:
| Main Authors: | P. Urgilés, J. Claver, M. A. Sebastián |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2019-01-01
|
| Series: | Complexity |
| Online Access: | http://dx.doi.org/10.1155/2019/3190830 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Comparative analysis of earned value management techniques in construction projects
by: Mohamed Elsaid, et al.
Published: (2025-07-01) -
Earnings Management, Value Relevance Of Earnings and Book Value of Equity
by: Imam Subekti
Published: (2013-11-01) -
The impact of economic fluctuations on earnings forecast
by: Ata Molodpoor, et al.
Published: (2015-07-01) -
IMPLEMENTING CONTROLLED EARNED VALUE MANAGEMENT TECHNIQUES IN CONSTRUCTION
by: Yasser M. R. Aboelmagd
Published: (2024-09-01) -
The Effect of Cost Categories and the Origin of their Stickiness on Earnings Forecast: A Comparative Study
by: Ali Shirzad, et al.
Published: (2020-08-01)