Stability Analysis of TBM Tunnel Undercrossing Existing High-Speed Railway Tunnel: A Case Study from Yangtaishan Tunnel of Shenzhen Metro Line 6
During the construction of the underpass of a new tunnel, the excavation unloading effect disturbs surrounding rock masses and promotes surrounding rock deformation, inevitably changing stress and displacement in the existing tunnel. Taking Yangtaishan tunnel excavation of Shenzhen Metro Line 6 as a...
Saved in:
Main Authors: | Mingji Zhao, Yun Cheng, Zhanping Song, Tong Wang, Yuwei Zhang, Yitong Gong, Yuncai Song |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2021-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2021/6674862 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Optimization of Construction Parameters and Deformation Characteristics of Large-Section Loess Tunnel: A Case Study from Xi’an Metro
by: Mingji Zhao, et al.
Published: (2021-01-01) -
Modeling of Loess Soaking Induced Impacts on a Metro Tunnel Using a Water Soaking System in Centrifuge
by: Yuwei Zhang, et al.
Published: (2019-01-01) -
Risk Assessment of an Existing Metro Tunnel in Close Proximity to New Shield Tunnels following Construction
by: Yong Xu, et al.
Published: (2022-01-01) -
Experimental Study on the Evolution of Argillization of Mudstone and Cutter Wear during the TBM Tunnelling
by: Kanglei Song, et al.
Published: (2021-01-01) -
Prediction of Bench Blasting Vibration on Slope and Safety Threshold of Blasting Vibration Velocity to Undercrossing Tunnel
by: Li He, et al.
Published: (2021-01-01)