Differential Analysis and Prediction Optimization of Ground Surface Settlement Induced by Quasi-Rectangular Shield and Pipe Jacking Tunnelling
The shield method and pipe jacking method will impact the ground surface and surrounding settlement during tunnel construction. Due to their different tunnelling principles and their cross-section characteristics, the impact on the stratum is often different. To study the differences between the two...
Saved in:
Main Authors: | , , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2022-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2022/3884494 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1832554710942351360 |
---|---|
author | Xue Liu Peinan Li Jun Liu Zeyu Dai Peixin Chen Xiaoyong Kou Jie Fan |
author_facet | Xue Liu Peinan Li Jun Liu Zeyu Dai Peixin Chen Xiaoyong Kou Jie Fan |
author_sort | Xue Liu |
collection | DOAJ |
description | The shield method and pipe jacking method will impact the ground surface and surrounding settlement during tunnel construction. Due to their different tunnelling principles and their cross-section characteristics, the impact on the stratum is often different. To study the differences between the two construction methods on ground surface settlement, numerical simulations, Peck empirical formulas, and field measurement data were used for analysis and comparison in this work. Two correction coefficients α and λ are introduced for correction on the basis of the DOT Peck formula, and the analysis of sensitivity factors for the ground settlement for the two construction methods is carried out. The numerical simulation results show that the ground settlement induced by pipe jacking construction is smaller than that of the shield, and this simulation result is confirmed by the field measurement result. When λ is selected from 0.85 to 0.91 and α from 1 to 1.1 for the shield project, 1.2 to 1.4, and 1.4 to 1.6 for the pipe jacking project, the modified formula can better predict the ground surface settlement. According to the sensitivity factor analysis, grouting pressure and elastic modulus of grout material exert a more significant influence on pipe jacking construction. The retreat of the pipe section caused by the tunnelling pressure difference will lead to 0 mm ∼ 1.93 mm fluctuation on the ground surface. |
format | Article |
id | doaj-art-6dbd86666598401580e95a294a487553 |
institution | Kabale University |
issn | 1687-8094 |
language | English |
publishDate | 2022-01-01 |
publisher | Wiley |
record_format | Article |
series | Advances in Civil Engineering |
spelling | doaj-art-6dbd86666598401580e95a294a4875532025-02-03T05:50:45ZengWileyAdvances in Civil Engineering1687-80942022-01-01202210.1155/2022/3884494Differential Analysis and Prediction Optimization of Ground Surface Settlement Induced by Quasi-Rectangular Shield and Pipe Jacking TunnellingXue Liu0Peinan Li1Jun Liu2Zeyu Dai3Peixin Chen4Xiaoyong Kou5Jie Fan6College of Environmental Science and EngineeringCollege of Environmental Science and EngineeringCollege of Urban Railway TransportationCollege of Environmental Science and EngineeringShanghai Tunnel Engineering Co., Ltd.Shanghai Tunnel Engineering Co., Ltd.Shanghai Tunnel Engineering Co., Ltd.The shield method and pipe jacking method will impact the ground surface and surrounding settlement during tunnel construction. Due to their different tunnelling principles and their cross-section characteristics, the impact on the stratum is often different. To study the differences between the two construction methods on ground surface settlement, numerical simulations, Peck empirical formulas, and field measurement data were used for analysis and comparison in this work. Two correction coefficients α and λ are introduced for correction on the basis of the DOT Peck formula, and the analysis of sensitivity factors for the ground settlement for the two construction methods is carried out. The numerical simulation results show that the ground settlement induced by pipe jacking construction is smaller than that of the shield, and this simulation result is confirmed by the field measurement result. When λ is selected from 0.85 to 0.91 and α from 1 to 1.1 for the shield project, 1.2 to 1.4, and 1.4 to 1.6 for the pipe jacking project, the modified formula can better predict the ground surface settlement. According to the sensitivity factor analysis, grouting pressure and elastic modulus of grout material exert a more significant influence on pipe jacking construction. The retreat of the pipe section caused by the tunnelling pressure difference will lead to 0 mm ∼ 1.93 mm fluctuation on the ground surface.http://dx.doi.org/10.1155/2022/3884494 |
spellingShingle | Xue Liu Peinan Li Jun Liu Zeyu Dai Peixin Chen Xiaoyong Kou Jie Fan Differential Analysis and Prediction Optimization of Ground Surface Settlement Induced by Quasi-Rectangular Shield and Pipe Jacking Tunnelling Advances in Civil Engineering |
title | Differential Analysis and Prediction Optimization of Ground Surface Settlement Induced by Quasi-Rectangular Shield and Pipe Jacking Tunnelling |
title_full | Differential Analysis and Prediction Optimization of Ground Surface Settlement Induced by Quasi-Rectangular Shield and Pipe Jacking Tunnelling |
title_fullStr | Differential Analysis and Prediction Optimization of Ground Surface Settlement Induced by Quasi-Rectangular Shield and Pipe Jacking Tunnelling |
title_full_unstemmed | Differential Analysis and Prediction Optimization of Ground Surface Settlement Induced by Quasi-Rectangular Shield and Pipe Jacking Tunnelling |
title_short | Differential Analysis and Prediction Optimization of Ground Surface Settlement Induced by Quasi-Rectangular Shield and Pipe Jacking Tunnelling |
title_sort | differential analysis and prediction optimization of ground surface settlement induced by quasi rectangular shield and pipe jacking tunnelling |
url | http://dx.doi.org/10.1155/2022/3884494 |
work_keys_str_mv | AT xueliu differentialanalysisandpredictionoptimizationofgroundsurfacesettlementinducedbyquasirectangularshieldandpipejackingtunnelling AT peinanli differentialanalysisandpredictionoptimizationofgroundsurfacesettlementinducedbyquasirectangularshieldandpipejackingtunnelling AT junliu differentialanalysisandpredictionoptimizationofgroundsurfacesettlementinducedbyquasirectangularshieldandpipejackingtunnelling AT zeyudai differentialanalysisandpredictionoptimizationofgroundsurfacesettlementinducedbyquasirectangularshieldandpipejackingtunnelling AT peixinchen differentialanalysisandpredictionoptimizationofgroundsurfacesettlementinducedbyquasirectangularshieldandpipejackingtunnelling AT xiaoyongkou differentialanalysisandpredictionoptimizationofgroundsurfacesettlementinducedbyquasirectangularshieldandpipejackingtunnelling AT jiefan differentialanalysisandpredictionoptimizationofgroundsurfacesettlementinducedbyquasirectangularshieldandpipejackingtunnelling |