Signaling System Renovation Plan for Suzhou Rail Transit Line 3 and Line 11 Through Train Operation

Objective To facilitate the integration of passenger flow between Suzhou and Shanghai, Suzhou Rail Transit Line 3 and Line 11 are connected at Weiting Station, where passengers currently transfer via the concourse within the fare-paid zone, resulting in a restriction of the operational capacity for...

Full description

Saved in:
Bibliographic Details
Main Authors: SUN Yao, LI Xin, SHEN Bingnai
Format: Article
Language:zho
Published: Urban Mass Transit Magazine Press 2024-10-01
Series:Chengshi guidao jiaotong yanjiu
Subjects:
Online Access:https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2024.10.059.html
Tags: Add Tag
No Tags, Be the first to tag this record!

Similar Items