Signaling System Renovation Plan for Suzhou Rail Transit Line 3 and Line 11 Through Train Operation
Objective To facilitate the integration of passenger flow between Suzhou and Shanghai, Suzhou Rail Transit Line 3 and Line 11 are connected at Weiting Station, where passengers currently transfer via the concourse within the fare-paid zone, resulting in a restriction of the operational capacity for...
Saved in:
| Main Authors: | SUN Yao, LI Xin, SHEN Bingnai |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Urban Mass Transit Magazine Press
2024-10-01
|
| Series: | Chengshi guidao jiaotong yanjiu |
| Subjects: | |
| Online Access: | https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2024.10.059.html |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Signaling System Renovation Key Technology Solutions of Suzhou Rail Transit Line 11 and Line 3 for Through Train Operation
by: LIU Dongdong, et al.
Published: (2024-12-01) -
Practice and Reflection on Renovation of Shanghai Urban Rail Transit Existing Lines
by: WANG Sitao, et al.
Published: (2025-05-01) -
Types and Implementation Key Points of Expansion and Renovation for Urban Rail Transit Existing Lines
by: CHEN Yan, et al.
Published: (2024-12-01) -
Operation Control Method for Degraded Trains after Shanghai Rail Transit Lines 3 and 4 Signaling System Upgrade and Renovation
by: LI Yongzheng
Published: (2024-11-01) -
Expansion and Renovation Plan for Urban Rail Transit Video Surveillance System Based on Cloud Storage Technology
by: LIU Dongwen, et al.
Published: (2025-06-01)