Signaling System Renovation Plan for Suzhou Rail Transit Line 3 and Line 11 Through Train Operation

Objective To facilitate the integration of passenger flow between Suzhou and Shanghai, Suzhou Rail Transit Line 3 and Line 11 are connected at Weiting Station, where passengers currently transfer via the concourse within the fare-paid zone, resulting in a restriction of the operational capacity for...

Full description

Saved in:
Bibliographic Details
Main Authors: SUN Yao, LI Xin, SHEN Bingnai
Format: Article
Language:zho
Published: Urban Mass Transit Magazine Press 2024-10-01
Series:Chengshi guidao jiaotong yanjiu
Subjects:
Online Access:https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2024.10.059.html
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850184549350244352
author SUN Yao
LI Xin
SHEN Bingnai
author_facet SUN Yao
LI Xin
SHEN Bingnai
author_sort SUN Yao
collection DOAJ
description Objective To facilitate the integration of passenger flow between Suzhou and Shanghai, Suzhou Rail Transit Line 3 and Line 11 are connected at Weiting Station, where passengers currently transfer via the concourse within the fare-paid zone, resulting in a restriction of the operational capacity for both Line 3 and Line 11. To meet the urgent need for capacity enhancement, a renovation plan of the signaling system for Line 3 and Line 11 through train operation is required. Method The existing conditions and technical differences between the signaling systems of Line 3 and Line 11 are analyzed. Based on different wireless communication standards, a signaling system renovation plan is proposed to meet the requirements of the through train operation between two lines. The implementation plan for the signaling system renovation is designed according to the project preparation schedule for Line 3 and Line 11 signaling system upgrade, focusing on modifications of the on-board signaling subsystem, ATS (automatic train supervision) subsystem, mainline station signaling subsystem, and depot signaling subsystem. Result & Conclusion Through adaptive modifications to the signaling systems of Line 3 and Line 11, train cross-line driverless operation is achieved, the compatibility and interchangeability of on-board ATC (automatic train control) equipment, ATS servers, and workstation hardware are implemented, allowing for uninterrupted automatic switching of vehicle-wayside wireless communication. Trains can operate seamlessly across Line 3 and Line 11 in FAO (fully automatic operation) mode, enhancing the operational efficiency of urban rail transit and improving the passenger travel experience.
format Article
id doaj-art-6d52464d75db41fab9bc4c1a3e110781
institution OA Journals
issn 1007-869X
language zho
publishDate 2024-10-01
publisher Urban Mass Transit Magazine Press
record_format Article
series Chengshi guidao jiaotong yanjiu
spelling doaj-art-6d52464d75db41fab9bc4c1a3e1107812025-08-20T02:17:00ZzhoUrban Mass Transit Magazine PressChengshi guidao jiaotong yanjiu1007-869X2024-10-01271032232510.16037/j.1007-869x.2024.10.059Signaling System Renovation Plan for Suzhou Rail Transit Line 3 and Line 11 Through Train OperationSUN Yao0LI Xin1SHEN Bingnai2China Railway Siyuan Survey and Design Group Co., Ltd., 430063, Wuhan, ChinaSuzhou Rail Transit Group Co., Ltd., 215124, Suzhou, ChinaSuzhou Rail Transit Group Co., Ltd., 215124, Suzhou, ChinaObjective To facilitate the integration of passenger flow between Suzhou and Shanghai, Suzhou Rail Transit Line 3 and Line 11 are connected at Weiting Station, where passengers currently transfer via the concourse within the fare-paid zone, resulting in a restriction of the operational capacity for both Line 3 and Line 11. To meet the urgent need for capacity enhancement, a renovation plan of the signaling system for Line 3 and Line 11 through train operation is required. Method The existing conditions and technical differences between the signaling systems of Line 3 and Line 11 are analyzed. Based on different wireless communication standards, a signaling system renovation plan is proposed to meet the requirements of the through train operation between two lines. The implementation plan for the signaling system renovation is designed according to the project preparation schedule for Line 3 and Line 11 signaling system upgrade, focusing on modifications of the on-board signaling subsystem, ATS (automatic train supervision) subsystem, mainline station signaling subsystem, and depot signaling subsystem. Result & Conclusion Through adaptive modifications to the signaling systems of Line 3 and Line 11, train cross-line driverless operation is achieved, the compatibility and interchangeability of on-board ATC (automatic train control) equipment, ATS servers, and workstation hardware are implemented, allowing for uninterrupted automatic switching of vehicle-wayside wireless communication. Trains can operate seamlessly across Line 3 and Line 11 in FAO (fully automatic operation) mode, enhancing the operational efficiency of urban rail transit and improving the passenger travel experience.https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2024.10.059.htmlsuzhou rail transitthrough train operationsignaling systemrenovation plan
spellingShingle SUN Yao
LI Xin
SHEN Bingnai
Signaling System Renovation Plan for Suzhou Rail Transit Line 3 and Line 11 Through Train Operation
Chengshi guidao jiaotong yanjiu
suzhou rail transit
through train operation
signaling system
renovation plan
title Signaling System Renovation Plan for Suzhou Rail Transit Line 3 and Line 11 Through Train Operation
title_full Signaling System Renovation Plan for Suzhou Rail Transit Line 3 and Line 11 Through Train Operation
title_fullStr Signaling System Renovation Plan for Suzhou Rail Transit Line 3 and Line 11 Through Train Operation
title_full_unstemmed Signaling System Renovation Plan for Suzhou Rail Transit Line 3 and Line 11 Through Train Operation
title_short Signaling System Renovation Plan for Suzhou Rail Transit Line 3 and Line 11 Through Train Operation
title_sort signaling system renovation plan for suzhou rail transit line 3 and line 11 through train operation
topic suzhou rail transit
through train operation
signaling system
renovation plan
url https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2024.10.059.html
work_keys_str_mv AT sunyao signalingsystemrenovationplanforsuzhourailtransitline3andline11throughtrainoperation
AT lixin signalingsystemrenovationplanforsuzhourailtransitline3andline11throughtrainoperation
AT shenbingnai signalingsystemrenovationplanforsuzhourailtransitline3andline11throughtrainoperation