Analysis and Prediction of the Factors Influencing Postconstruction Surface Deformation of Pipe-Jacking Tunnel in Soft Clay Strata in China
During the postconstruction operation period, the engineering structure and operation safety of a pipe-jacking tunnel are more likely to be threatened by the surrounding environment and groundwater when it is located in a soft clay stratum. Surface settlement data related to the construction of 24 r...
Saved in:
| Main Authors: | Guo-jing Cui, Jiang-sheng Xie, Yin-hao Sun, Yong-ji Gao |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2023-01-01
|
| Series: | Advances in Civil Engineering |
| Online Access: | http://dx.doi.org/10.1155/2023/6474415 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Influence Factors of Strata Deformation Response Induced by Shield Tunneling in Thick Silty Clay Layer
by: LI Liang, et al.
Published: (2025-05-01) -
The Development of the Pipe Jacking Guidance Technology
by: Di Qiu, et al.
Published: (2025-02-01) -
Disturbance analysis of shield tunneling in clay and limestone composite strata using EDEM simulation
by: Shuguang Song, et al.
Published: (2025-04-01) -
Deformation and Control Measures of Existing Metro Shield Tunnels Induced by Large-Section Pipe Jacking Over-Crossing: A Case Study
by: Xiaoxu Tian, et al.
Published: (2025-06-01) -
Impact Analysis of Pipe Jacking Crossing and Parallel Construction on Existing Metro Shield Tunnels
by: HUANG Jianhua, et al.