ANALYSIS OF LABOR PRODUCTIVITY OF BEAM AND FLOOR PLATE WORK WITH WORK SAMPLING METHOD

Productivity is a crucial parameter in achieving project objectives. This research aims to obtain the value of labor productivity on the beam structure and floor plate in home construction using the work sampling method and analyze the comparison of the labor coefficient to the Analysis of Unit Pri...

Full description

Saved in:
Bibliographic Details
Main Authors: Mulyadi Sugih Dharsono, Siti Hindun
Format: Article
Language:English
Published: Universitas Negeri Jakarta 2024-09-01
Series:Jurnal Pensil
Subjects:
Online Access:https://journal.unj.ac.id/unj/index.php/jpensil/article/view/44934
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850247595439423488
author Mulyadi Sugih Dharsono
Siti Hindun
author_facet Mulyadi Sugih Dharsono
Siti Hindun
author_sort Mulyadi Sugih Dharsono
collection DOAJ
description Productivity is a crucial parameter in achieving project objectives. This research aims to obtain the value of labor productivity on the beam structure and floor plate in home construction using the work sampling method and analyze the comparison of the labor coefficient to the Analysis of Unit Price of Work (AHSP) in 2022. Experimental quantitative research describes this approach, utilizing information gathered through documentation, questionnaires, and participant observation. Data analysis in this research includes Data Uniformity Analysis, Data Sufficiency Analysis, Labor Utilization Rate (LUR), and Spearman Correlation. The findings revealed that the beam concreting job in home construction achieved a labor productivity rate (LUR) of 61.61% and 84.417 kg/person. In the floor plate concreting work, labor productivity reached 98.787 kg/person with a LUR value of 54.10%. Meanwhile, in formwork work, labor productivity reached 3.577 m/person with a LUR value of 53.37%, and in casting work, labor productivity reached 1.287 m/hour with a LUR value of 53.37%. Correlation analysis shows a positive relationship between Labor Utilization Rate and labor coefficient in concreting and formwork works. This indicates that the more efficient the labor, the higher the productivity in carrying out these activities, and the smaller the coefficient value obtained
format Article
id doaj-art-6c3312f94c9645af88b87efc5ecc1891
institution OA Journals
issn 2301-8437
2623-1085
language English
publishDate 2024-09-01
publisher Universitas Negeri Jakarta
record_format Article
series Jurnal Pensil
spelling doaj-art-6c3312f94c9645af88b87efc5ecc18912025-08-20T01:58:54ZengUniversitas Negeri JakartaJurnal Pensil2301-84372623-10852024-09-0113310.21009/jpensil.v13i3.44934ANALYSIS OF LABOR PRODUCTIVITY OF BEAM AND FLOOR PLATE WORK WITH WORK SAMPLING METHODMulyadi Sugih Dharsono0Siti Hindun1Universitas PraditaProgram Studi Teknik Sipil, Fakultas Sains dan Teknologi, Universitas Pradita, Jalan Gading Serpong Boulevard No.1 Tower 1 Tangerang, 15810, Indonesia Productivity is a crucial parameter in achieving project objectives. This research aims to obtain the value of labor productivity on the beam structure and floor plate in home construction using the work sampling method and analyze the comparison of the labor coefficient to the Analysis of Unit Price of Work (AHSP) in 2022. Experimental quantitative research describes this approach, utilizing information gathered through documentation, questionnaires, and participant observation. Data analysis in this research includes Data Uniformity Analysis, Data Sufficiency Analysis, Labor Utilization Rate (LUR), and Spearman Correlation. The findings revealed that the beam concreting job in home construction achieved a labor productivity rate (LUR) of 61.61% and 84.417 kg/person. In the floor plate concreting work, labor productivity reached 98.787 kg/person with a LUR value of 54.10%. Meanwhile, in formwork work, labor productivity reached 3.577 m/person with a LUR value of 53.37%, and in casting work, labor productivity reached 1.287 m/hour with a LUR value of 53.37%. Correlation analysis shows a positive relationship between Labor Utilization Rate and labor coefficient in concreting and formwork works. This indicates that the more efficient the labor, the higher the productivity in carrying out these activities, and the smaller the coefficient value obtained https://journal.unj.ac.id/unj/index.php/jpensil/article/view/44934Home ConstructionProductivityWork Sampling
spellingShingle Mulyadi Sugih Dharsono
Siti Hindun
ANALYSIS OF LABOR PRODUCTIVITY OF BEAM AND FLOOR PLATE WORK WITH WORK SAMPLING METHOD
Jurnal Pensil
Home Construction
Productivity
Work Sampling
title ANALYSIS OF LABOR PRODUCTIVITY OF BEAM AND FLOOR PLATE WORK WITH WORK SAMPLING METHOD
title_full ANALYSIS OF LABOR PRODUCTIVITY OF BEAM AND FLOOR PLATE WORK WITH WORK SAMPLING METHOD
title_fullStr ANALYSIS OF LABOR PRODUCTIVITY OF BEAM AND FLOOR PLATE WORK WITH WORK SAMPLING METHOD
title_full_unstemmed ANALYSIS OF LABOR PRODUCTIVITY OF BEAM AND FLOOR PLATE WORK WITH WORK SAMPLING METHOD
title_short ANALYSIS OF LABOR PRODUCTIVITY OF BEAM AND FLOOR PLATE WORK WITH WORK SAMPLING METHOD
title_sort analysis of labor productivity of beam and floor plate work with work sampling method
topic Home Construction
Productivity
Work Sampling
url https://journal.unj.ac.id/unj/index.php/jpensil/article/view/44934
work_keys_str_mv AT mulyadisugihdharsono analysisoflaborproductivityofbeamandfloorplateworkwithworksamplingmethod
AT sitihindun analysisoflaborproductivityofbeamandfloorplateworkwithworksamplingmethod