Practical Evaluation Method for the Pouring Scheme of a Long-Span Concrete-Filled Steel Tube Arch Bridge
Concrete pouring steel tube arch is a critical part in the construction of a long-span concrete-filled steel tube arch bridge. With the adoption of the improved TOPSIS, this study summarized five indicators that controlled the concrete-filled steel tube pouring sequence. The indicators include the v...
Saved in:
Main Authors: | Xinyu Yao, Tianzhi Hao, Nianchun Deng |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2022-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2022/9019612 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Temperature Load Parameters and Thermal Effects of a Long-Span Concrete-Filled Steel Tube Arch Bridge in Tibet
by: Tuo Shi, et al.
Published: (2020-01-01) -
Suspender Replacement Method for Long-Span Concrete-Filled Steel Tubular Arch Bridges and Cable Force Measurement Based on Frequency Method
by: Yulin Deng, et al.
Published: (2021-01-01) -
Seismic Damage Analysis of Large-Span Tied-Arch Bridge with Concrete-Filled Steel Tubes Subjected to Near-Fault Ground Motion
by: Yingzhi Xia, et al.
Published: (2022-01-01) -
Analysis of Traveling Wave and Combined Site Effect of Long-Span Upper-Bearing Concrete-Filled Steel Tubular Arch Bridge
by: Zite Li, et al.
Published: (2024-01-01) -
Numerical Investigation of the Characteristics of the Dynamic Load Allowance in a Concrete-Filled Steel Tube Arch Bridge Subjected to Moving Vehicles
by: Qingfei Gao, et al.
Published: (2020-01-01)