Practical Evaluation Method for the Pouring Scheme of a Long-Span Concrete-Filled Steel Tube Arch Bridge

Concrete pouring steel tube arch is a critical part in the construction of a long-span concrete-filled steel tube arch bridge. With the adoption of the improved TOPSIS, this study summarized five indicators that controlled the concrete-filled steel tube pouring sequence. The indicators include the v...

Full description

Saved in:
Bibliographic Details
Main Authors: Xinyu Yao, Tianzhi Hao, Nianchun Deng
Format: Article
Language:English
Published: Wiley 2022-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2022/9019612
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832555183456911360
author Xinyu Yao
Tianzhi Hao
Nianchun Deng
author_facet Xinyu Yao
Tianzhi Hao
Nianchun Deng
author_sort Xinyu Yao
collection DOAJ
description Concrete pouring steel tube arch is a critical part in the construction of a long-span concrete-filled steel tube arch bridge. With the adoption of the improved TOPSIS, this study summarized five indicators that controlled the concrete-filled steel tube pouring sequence. The indicators include the vertical displacement of the arch rib, lateral offset of the arch rib, steel tube stress, concrete stress, and elastic safety factor of the arch rib. Furthermore, a comprehensive objective function-rationalization index was proposed, based on which a practical evaluation and determination method for pouring scheme of the long-span concrete-filled steel tube arch bridge was developed. The results showed that a pouring sequence with relatively small stress in the arch rib, advanced alignment, and good stability could be determined using the proposed method.
format Article
id doaj-art-655ca981c8054ec9a6e624e08cd68f74
institution Kabale University
issn 1687-8094
language English
publishDate 2022-01-01
publisher Wiley
record_format Article
series Advances in Civil Engineering
spelling doaj-art-655ca981c8054ec9a6e624e08cd68f742025-02-03T05:49:22ZengWileyAdvances in Civil Engineering1687-80942022-01-01202210.1155/2022/9019612Practical Evaluation Method for the Pouring Scheme of a Long-Span Concrete-Filled Steel Tube Arch BridgeXinyu Yao0Tianzhi Hao1Nianchun Deng2Guangxi Transportation Science and Technology Group Co., Ltd.Guangxi Beitou Traffic Maintenance Technology Group Co., Ltd.College of Civil Engineering and ArchitectureConcrete pouring steel tube arch is a critical part in the construction of a long-span concrete-filled steel tube arch bridge. With the adoption of the improved TOPSIS, this study summarized five indicators that controlled the concrete-filled steel tube pouring sequence. The indicators include the vertical displacement of the arch rib, lateral offset of the arch rib, steel tube stress, concrete stress, and elastic safety factor of the arch rib. Furthermore, a comprehensive objective function-rationalization index was proposed, based on which a practical evaluation and determination method for pouring scheme of the long-span concrete-filled steel tube arch bridge was developed. The results showed that a pouring sequence with relatively small stress in the arch rib, advanced alignment, and good stability could be determined using the proposed method.http://dx.doi.org/10.1155/2022/9019612
spellingShingle Xinyu Yao
Tianzhi Hao
Nianchun Deng
Practical Evaluation Method for the Pouring Scheme of a Long-Span Concrete-Filled Steel Tube Arch Bridge
Advances in Civil Engineering
title Practical Evaluation Method for the Pouring Scheme of a Long-Span Concrete-Filled Steel Tube Arch Bridge
title_full Practical Evaluation Method for the Pouring Scheme of a Long-Span Concrete-Filled Steel Tube Arch Bridge
title_fullStr Practical Evaluation Method for the Pouring Scheme of a Long-Span Concrete-Filled Steel Tube Arch Bridge
title_full_unstemmed Practical Evaluation Method for the Pouring Scheme of a Long-Span Concrete-Filled Steel Tube Arch Bridge
title_short Practical Evaluation Method for the Pouring Scheme of a Long-Span Concrete-Filled Steel Tube Arch Bridge
title_sort practical evaluation method for the pouring scheme of a long span concrete filled steel tube arch bridge
url http://dx.doi.org/10.1155/2022/9019612
work_keys_str_mv AT xinyuyao practicalevaluationmethodforthepouringschemeofalongspanconcretefilledsteeltubearchbridge
AT tianzhihao practicalevaluationmethodforthepouringschemeofalongspanconcretefilledsteeltubearchbridge
AT nianchundeng practicalevaluationmethodforthepouringschemeofalongspanconcretefilledsteeltubearchbridge