Human Resource Scheduling in Project Management Using the Simulated Annealing Algorithm with the Human Factors Engineering Approach
Manpower scheduling means assigning a work pattern (shift day) according to the wants and needs of the system and the workforce with the goal of minimum cost. Many production and service systems require multiple scheduling. This problem is generally NP-complete, and it takes a long time to solve it...
Saved in:
| Main Authors: | , , |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2022-01-01
|
| Series: | Discrete Dynamics in Nature and Society |
| Online Access: | http://dx.doi.org/10.1155/2022/3597014 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!