Multi-Objective Scheduling Optimization of Prefabricated Components Production Using Improved Non-Dominated Sorting Generic Algorithm II
The traditional construction industry is characterized by high energy consumption and significant carbon emissions, primarily due to its reliance on on-site manual labor and wet operations, which are not only low in mechanization but also result in low material efficiency and substantial constructio...
Saved in:
| Main Authors: | Yishi Zhao, Shaokang Du, Ming Tu, Haichuan Ma, Jianga Shang, Xiuqiao Xiang |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
MDPI AG
2025-02-01
|
| Series: | Buildings |
| Subjects: | |
| Online Access: | https://www.mdpi.com/2075-5309/15/5/742 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Integrated Scheduling Optimization for Multi-Line Production and Transportation of Prefabricated Components Considering Shared Resources
by: Yiran Dan, et al.
Published: (2025-01-01) -
Dual-objective optimization of prefabricated component logistics based on JIT strategy
by: Chunli Zhang, et al.
Published: (2024-12-01) -
Schedule Risk Analysis of Prefabricated Building Projects Based on DEMATEL-ISM and Bayesian Networks
by: Chunling Zhong, et al.
Published: (2025-02-01) -
Construction Scheduling Optimization of Prefabricated Buildings Under Resource Constraints Based on an Improved Whale Optimization Algorithm
by: Rui Su, et al.
Published: (2025-07-01) -
The Supplier Selection of Prefabricated Component Production Line: A Lean-Based AHP–Improved VIKOR Framework
by: Pei Dang, et al.
Published: (2024-12-01)