Extended Station Blackout Coping Capabilities of APR1400
The Fukushima Dai-ichi nuclear power plant accident shows that an extreme natural disaster can prevent the proper restoration of electric power for several days, so-called extended SBO. In Korea, the government and industry performed comprehensive special safety inspections on all domestic nuclear p...
Saved in:
| Main Authors: | Sang-Won Lee, Tae Hyub Hong, Mi-Ro Seo, Young-Seung Lee, Hyeong-Taek Kim |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2014-01-01
|
| Series: | Science and Technology of Nuclear Installations |
| Online Access: | http://dx.doi.org/10.1155/2014/980418 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Consequence Analysis of a Station Blackout in Brazilian Nuclear Power Plant Angra 2
by: Andre S Aguiar, et al.
Published: (2022-10-01) -
Delayed Station Blackout Event and Nuclear Safety
by: Andrija Volkanovski, et al.
Published: (2015-01-01) -
Blackout /
by: Nance, John J.
Published: (2000) -
Investigation of Loss of Feedwater (LOFW) Accident in the APR-1400 Using Fault Tree Analysis
by: Muhammad Zubair
Published: (2022-01-01) -
Internet blackouts in Africa
by: Floribert Patrick C. Endong
Published: (2022-05-01)