Optimization Algorithm of Logistics Transportation Cost of Prefabricated Building Components for Project Management
Because the traditional logistics transportation cost optimization algorithm of prefabricated building components has the problems of long transportation time and high transportation cost, a logistics transportation cost optimization algorithm of prefabricated building components for project managem...
Saved in:
Main Author: | Xiaojiang Yang |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2022-01-01
|
Series: | Journal of Mathematics |
Online Access: | http://dx.doi.org/10.1155/2022/1460335 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Integrated Scheduling Optimization for Multi-Line Production and Transportation of Prefabricated Components Considering Shared Resources
by: Yiran Dan, et al.
Published: (2025-01-01) -
The Optimization of Transportation Costs in Logistics Enterprises with Time-Window Constraints
by: Qingyou Yan, et al.
Published: (2015-01-01) -
Impact Evaluation of Prefabricated Buildings Cost on Game Theory-Cloud Model
by: Na Li, et al.
Published: (2022-01-01) -
Study on Key Cost Drivers of Prefabricated Buildings Based on System Dynamics
by: Na Lou, et al.
Published: (2020-01-01) -
A BIM-Based Study on the Comprehensive Benefit Analysis for Prefabricated Building Projects in China
by: Yingbo Ji, et al.
Published: (2019-01-01)