Optimal Analysis of Tunnel Construction Methods through Cross Passage from Subway Shaft
The conversion section of the cross passage and shaft is a priority concern in the stress transformation of a tunnel structure during subway underground excavation. In the construction of Subway Line 5 in Xi'an, China, the main line in the loess layer was constructed through the cross passage f...
Saved in:
| Main Authors: | Zhanping Song, Zhilin Cao, Junbao Wang, Shoufeng Wei, Shichun Hu, Zelin Niu |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2018-01-01
|
| Series: | Advances in Civil Engineering |
| Online Access: | http://dx.doi.org/10.1155/2018/5181954 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Analysis on the Influence of Shaft and Cross Passage Turn to the Main Line of Ingate under Different Construction Schemes
by: Zhanping Song, et al.
Published: (2021-01-01) -
Causes of Delay in the Construction Projects of Subway Tunnel
by: Dingbang Zhang, et al.
Published: (2020-01-01) -
Evaluation of greenhouse gas emissions in subway tunnel construction
by: Yalin Guo, et al.
Published: (2025-06-01) -
Construction Sequence Optimization and Settlement Control Countermeasures of Metro Tunnels Underpassing Expressway
by: Chengzhong Zhang, et al.
Published: (2021-01-01) -
Strata Response Analysis of Subway Tunnel Construction Under Hidden Karst Caves in the Tunnel Arch
by: HUANG Song
Published: (2024-12-01)