Construction Delays Due to Weather in Cold Regions: A Two-Stage Structural Equation Modeling and Artificial Neural Network Approach

Significant weather-induced delays often plague construction projects in India’s extremely cold regions, yet comprehensive studies addressing this issue remain scarce. This study aims to fill this gap by identifying key delay factors and proposing mitigation strategies for the construction industry....

Full description

Saved in:
Bibliographic Details
Main Authors: Atul Kumar Singh, Faizan Anjum, Pshtiwan Shakor, Varadhiyagounder Ranganathan Prasath Kumar, Sathvik Sharath Chandra, Saeed Reza Mohandes, Bankole Awuzie
Format: Article
Language:English
Published: MDPI AG 2025-06-01
Series:Buildings
Subjects:
Online Access:https://www.mdpi.com/2075-5309/15/11/1916
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Significant weather-induced delays often plague construction projects in India’s extremely cold regions, yet comprehensive studies addressing this issue remain scarce. This study aims to fill this gap by identifying key delay factors and proposing mitigation strategies for the construction industry. Through an extensive literature review, 42 delay factors were identified and categorized into four groups. A survey of 83 experts from cold regions was conducted to evaluate these factors’ significance to contractors and subcontractors. Employing exploratory factor analysis (EFA), structural equation modeling (SEM), and artificial neural networks (ANN), the study analyzed the relationships between these factors and ranked their impact. The findings reveal that snowfall, rainfall, and low temperatures are the most significant contributors to delays, with snowfall being the most influential (significance: 1.000), followed by rainfall (0.890) and low temperatures (0.790). This research establishes a risk hierarchy and develops a predictive model to facilitate the proactive scheduling of challenging tasks during favorable seasons. This study advances the understanding of weather-induced delays in India’s cold regions and offers valuable insights for project management in such climates. However, it underscores the importance of clearly articulating its novel contributions to differentiate it within the existing literature on weather-related construction delays.