THE PURPOSE. Improving the energy efficiency of a hydroelectric power plant (HPP). Determination of the volume of lost thermal energy from HPP equipment. Development of options for the beneficial use of low-grade heat. Economic evaluation of the proposed options. Selection of the most appropriate wa...

Full description

Saved in:
Bibliographic Details
Main Authors: V. D. Yurovskaya, S. V. Latushkina
Format: Article
Language:English
Published: Kazan State Power Engineering University 2022-12-01
Series:Известия высших учебных заведений: Проблемы энергетики
Subjects:
Online Access:https://www.energyret.ru/jour/article/view/2413
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850268509472292864
author V. D. Yurovskaya
S. V. Latushkina
author_facet V. D. Yurovskaya
S. V. Latushkina
author_sort V. D. Yurovskaya
collection DOAJ
description THE PURPOSE. Improving the energy efficiency of a hydroelectric power plant (HPP). Determination of the volume of lost thermal energy from HPP equipment. Development of options for the beneficial use of low-grade heat. Economic evaluation of the proposed options. Selection of the most appropriate waste heat utilization option. METHODS. The methods of the theory of heat and mass transfer, thermodynamic analysis, technical and economic calculations in the energy sector are used in the work. RESULTS. The article determined the temperatures of heat carriers in the cooling system of the hydroelectric generator of the Bratsk HPP. Calculated heat losses in the amount of 92,52 MW. 3 variants of heat supply for the facilities of the Bratsk HPP have been laid. An optimized scheme of heat generation using a heat pump installation (HPI) has been developed. A feasibility study of the proposed options for heat supply has been carried out. An analysis of the Russian HPI market was carried out. A cost-effective heat supply option with 2 Viesmann Vitocal 350-G Pro HPI was selected for implementation with a capital investment 34,46 million of RUB and a payback period of 7,3 years. CONCLUSION. The results of technical and economic calculations show the feasibility of introducing a HPI into the heat generation system of the Bratsk HPP.
format Article
id doaj-art-60ae74cecd884e9196d95efd1144cbdf
institution OA Journals
issn 1998-9903
language English
publishDate 2022-12-01
publisher Kazan State Power Engineering University
record_format Article
series Известия высших учебных заведений: Проблемы энергетики
spelling doaj-art-60ae74cecd884e9196d95efd1144cbdf2025-08-20T01:53:26ZengKazan State Power Engineering UniversityИзвестия высших учебных заведений: Проблемы энергетики1998-99032022-12-01245132210.30724/1998-9903-2022-24-5-13-22883Project of using low-potential energy sources at the Bratsk hydro power plantV. D. Yurovskaya0S. V. Latushkina1Bratsk State UniversityBratsk State UniversityTHE PURPOSE. Improving the energy efficiency of a hydroelectric power plant (HPP). Determination of the volume of lost thermal energy from HPP equipment. Development of options for the beneficial use of low-grade heat. Economic evaluation of the proposed options. Selection of the most appropriate waste heat utilization option. METHODS. The methods of the theory of heat and mass transfer, thermodynamic analysis, technical and economic calculations in the energy sector are used in the work. RESULTS. The article determined the temperatures of heat carriers in the cooling system of the hydroelectric generator of the Bratsk HPP. Calculated heat losses in the amount of 92,52 MW. 3 variants of heat supply for the facilities of the Bratsk HPP have been laid. An optimized scheme of heat generation using a heat pump installation (HPI) has been developed. A feasibility study of the proposed options for heat supply has been carried out. An analysis of the Russian HPI market was carried out. A cost-effective heat supply option with 2 Viesmann Vitocal 350-G Pro HPI was selected for implementation with a capital investment 34,46 million of RUB and a payback period of 7,3 years. CONCLUSION. The results of technical and economic calculations show the feasibility of introducing a HPI into the heat generation system of the Bratsk HPP.https://www.energyret.ru/jour/article/view/2413low-potential energyhydroelectric power plantcooling systemheat pump installationheating systemwaste heat
spellingShingle V. D. Yurovskaya
S. V. Latushkina
Project of using low-potential energy sources at the Bratsk hydro power plant
Известия высших учебных заведений: Проблемы энергетики
low-potential energy
hydroelectric power plant
cooling system
heat pump installation
heating system
waste heat
title Project of using low-potential energy sources at the Bratsk hydro power plant
title_full Project of using low-potential energy sources at the Bratsk hydro power plant
title_fullStr Project of using low-potential energy sources at the Bratsk hydro power plant
title_full_unstemmed Project of using low-potential energy sources at the Bratsk hydro power plant
title_short Project of using low-potential energy sources at the Bratsk hydro power plant
title_sort project of using low potential energy sources at the bratsk hydro power plant
topic low-potential energy
hydroelectric power plant
cooling system
heat pump installation
heating system
waste heat
url https://www.energyret.ru/jour/article/view/2413
work_keys_str_mv AT vdyurovskaya projectofusinglowpotentialenergysourcesatthebratskhydropowerplant
AT svlatushkina projectofusinglowpotentialenergysourcesatthebratskhydropowerplant